Author: Tsoupas, N.
Paper Title Page
TUOBA02 ER@CEBAF - A High Energy, Multi-pass Energy Recovery Experiment at CEBAF 1022
 
  • F. Méot, I. Ben-Zvi, Y. Hao, P. Korysko, C. Liu, M.G. Minty, V. Ptitsyn, G. Robert-Demolaize, T. Roser, P. Thieberger, N. Tsoupas
    BNL, Upton, Long Island, New York, USA
  • M.E. Bevins, S.A. Bogacz, D. Douglas, C.J. Dubbe, T.J. Michalski, F.C. Pilat, Y. Roblin, T. Satogata, M. Spata, C. Tennant, M.G. Tiefenback
    JLab, Newport News, Virginia, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
A high-energy, multiple-pass energy recovery (ER) experiment proposal, using CEBAF, is in preparation by a JLab-BNL collaboration. The experiment will be proposed in support of the electron-ion collider project (EIC) R&D going on at BNL. This new experiment extends the 2003, 1-pass, 1 GeV CEBAF-ER demonstration into a range of energy and recirculation passes commensurate with BNL's anticipated linac-ring EIC parameters. The experiment will study ER and recirculating beam dynamics in the presence of synchrotron radiation, provide opportunity to develop and test multiple-beam diagnostic instrumentation, and can also probe BBU limitations. This paper gives an overview of the ER@CEBAF project, its context and preparations.
 
slides icon Slides TUOBA02 [1.936 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOBA02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMW038 RHIC Operation with Asymmetric Collisions in 2015 1527
 
  • C. Liu, E.C. Aschenauer, G. Atoian, M. Blaskiewicz, K.A. Brown, D. Bruno, R. Connolly, T. D'Ottavio, K.A. Drees, W. Fischer, C.J. Gardner, X. Gu, T. Hayes, H. Huang, R.L. Hulsart, J.S. Laster, Y. Luo, Y. Makdisi, G.J. Marr, A. Marusic, F. Méot, K. Mernick, R.J. Michnoff, M.G. Minty, C. Montag, J. Morris, G. Narayan, S.K. Nayak, S. Nemesure, P.H. Pile, A. Poblaguev, V.H. Ranjbar, G. Robert-Demolaize, T. Roser, W.B. Schmidke, V. Schoefer, F. Severino, T.C. Shrey, K.S. Smith, D. Steski, S. Tepikian, D. Trbojevic, N. Tsoupas, G. Wang, K. Yip, A. Zaltsman, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York, USA
  • S.M. White
    ESRF, Grenoble, France
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Collisions with beams of highly asymmetric rigidities (proton-Gold and proton-Aluminum) were provided for the RHIC physics programs in 2015. Magnets were moved for the first time in RHIC prior to the run to accommodate the asymmetric beam trajectories during acceleration and at store. A special ramping scheme was designed to keep the revolution frequencies of the beams in the two rings equal. The unique operational experience of the asymmetric run will be reviewed.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPMW038  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMW011 Stable Spin Direction Investigations in RHIC 2442
 
  • F. Méot, H. Huang, N. Tsoupas
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Beam and spin dynamics investigations are part of the preparations and studies regarding RHIC collider runs, they are part as well of the efforts dedicated to improving stored beam polarization, and in view of the eRHIC EIC project. Some recent studies and their outcomes are discussed.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMW011  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMW027 The ERL-based Design of Electron-Hadron Collider eRHIC 2482
 
  • V. Ptitsyn, E.C. Aschenauer, I. Ben-Zvi, J.S. Berg, M. Blaskiewicz, S.J. Brooks, K.A. Brown, J.C. Brutus, O.V. Chubar, A.V. Fedotov, D.M. Gassner, H. Hahn, Y. Hao, A. Hershcovitch, H. Huang, W.A. Jackson, Y.C. Jing, R.F. Lambiase, V. Litvinenko, C. Liu, Y. Luo, G.J. Mahler, B. Martin, G.T. McIntyre, W. Meng, F. Méot, T.A. Miller, M.G. Minty, B. Parker, I. Pinayev, V.H. Ranjbar, T. Roser, J. Skaritka, R. Than, P. Thieberger, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, E. Wang, G. Wang, H. Witte, Q. Wu, C. Xu, W. Xu, A. Zaltsman
    BNL, Upton, Long Island, New York, USA
  • S.A. Belomestnykh
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Recent developments of the ERL-based design of future high luminosity electron-hadron collider eRHIC focused on balancing technological risks present in the design versus the design cost. As a result a lower risk design has been adopted at moderate cost increase. The modifications include a change of the main linac RF frequency, reduced number of SRF cavity types and modified electron spin transport using a spin rotator. A luminosity-staged approach is being explored with a Nominal design (L ~ 1033 cm-2 s-1) that employs reduced electron current and could possibly be based on classical electron cooling, and then with the Ultimate design (L > 1034 cm-2 s-1) that uses higher electron current and an innovative cooling technique (CeC). The paper describes the recent design modifications, and presents the full status of the eRHIC ERL-based design.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMW027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMW044 Start-to-End Simulation of eRHIC ERL 2535
 
  • Y. Hao, S.J. Brooks, Y.C. Jing, F. Méot, V. Ptitsyn, D. Trbojevic, N. Tsoupas
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
The ERL-ring eRHIC adopts the electron accelerator design of a multi-pass energy recovery linac (ERL), with fixed field alternating gradient (FFAG) recirculating passes. To ensure the beam quality in the accelerating and decelerating stage and the energy recovery efficiency, detailed start-to-end simulation is required to evaluate the various beam dynamics effects, such as synchrotron radiation, wake fields, coherent synchrotron radiation. In this paper, we present the eRHIC ERL start-to-end simulation strategy with various simulation codes and the current status.
 
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMW044  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)