Paper | Title | Page |
---|---|---|
TUOBA01 | Beam Commissioning of SuperKEKB | 1019 |
|
||
In this report, we describe the machine operation in the first 3 months of the Phase 1 commissioning of SuperKEKB. The beam commissioning is smoothly going on. Vacuum scrubbing, the optics corrections and others are described. | ||
Slides TUOBA01 [9.346 MB] | ||
DOI • | reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOBA01 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUOCB01 | First Commissioning of the SuperKEKB Vacuum System | 1086 |
|
||
The SuperKEKB, an electron-positron collider with asymmetric energies in KEK, has started the first commissioning with beams this year. One of major tasks in the commissioning is the beam scrubbing of new beam pipes in order to increase the beam lifetime and to decrease the background noise of the particle detector in the coming physics run. The temperatures and the vacuum pressures of new vacuum components, such as the bellows chambers, gate valves and the beam collimators, should be checked in this run. The decrease rate in the vacuum pressure are measured to estimate the vacuum scrubbing effect. Reported here will be the results obtained during the first commissioning and the present status of the vacuum system. | ||
Slides TUOCB01 [2.526 MB] | ||
DOI • | reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOCB01 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |