Author: Shaposhnikova, E.N.
Paper Title Page
MOPMW024 Design of the New Wideband RF System for the CERN PS Booster 441
 
  • M.M. Paoluzzi, S.C.P. Albright, M.E. Angoletta, L. Arnaudon, S. Energico, A. Findlay, M. Haase, M. Jaussi, A.J. Jones, D. Landré, J.C. Molendijk, D. Quartullo, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
 
  For the renovation and upgrade of the CERN PS Booster (PSB) RF systems a development project was launched in 2012. The design, based on a new approach, aimed at replacing the existing tuned, narrowband RF systems with wideband, modular, solid-state driven units. A wide range of issues had to be addressed spanning from RF power production, radiation hardness of solid-state devices, active cancellation of beam-induced voltages, dedicated low-level electronics allowing multi-harmonic operation and beam stability. Following a three-year prototyping and testing campaign and two international reviews, the project endorsement came at the end of year 2015. It foresees the complete removal of present h1, h2 and h10 systems and the deployment of a new one covering all the frequency ranges from 1 MHz to 18 MHz. The four PSB rings will be equipped with 144 identical acceleration cells providing 24 kV total RF voltage per ring. This paper describes the design concepts, the retained solutions, the expected performances and includes the procurement and implementation strategies. This activity is part of the LHC Injectors Upgrade project (LIU).  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPMW024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOR008 Beam Induced RF Heating in LHC in 2015 602
 
  • B. Salvant, O. Aberle, M. Albert, R. Alemany-Fernandez, G. Arduini, J. Baechler, M.J. Barnes, P. Baudrenghien, O.E. Berrig, N. Biancacci, G. Bregliozzi, J.V. Campelo, F. Carra, F. Caspers, P. Chiggiato, A. Danisi, H.A. Day, M. Deile, D. Druzhkin, J.F. Esteban Müller, S. Jakobsen, J. Kuczerowski, A. Lechner, R. Losito, A. Masi, N. Minafra, E. Métral, A.A. Nosych, A. Perillo Marcone, D. Perini, S. Redaelli, F. Roncarolo, G. Rumolo, E.N. Shaposhnikova, J.A. Uythoven, C. Vollinger, A.J. Välimaa, N. Wang, M. Wendt, J. Wenninger, C. Zannini
    CERN, Geneva, Switzerland
  • M. Bozzo
    INFN Genova, Genova, Italy
  • J.F. Esteban Müller
    EPFL, Lausanne, Switzerland
  • N. Wang
    IHEP, Beijing, People's Republic of China
 
  Following the recurrent beam induced RF issues that perturbed LHC operation during LHC Run 1, a series of actions were put in place to minimize the risk that similar issues would occur in LHC Run 2: longitudinal impedance reduction campaign and/or improvement of cooling for equipment that were problematic or at the limit during Run 1, stringent constraints enforced on new equipment that would be installed in the machine, tests to control the bunch length and longitudinal distribution, additional monitoring of temperature, new monitoring tools and warning chains. This contribution reports the outcome of these actions, both successes as well as shortcomings, and details the lessons learnt for the future runs.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOR008  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOY006 Preparations for Upgrading the RF Systems of the PS Booster 853
 
  • S.C.P. Albright, D. Quartullo, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
 
  The accelerators of the LHC injector chain need to be upgraded to provide the HL-LHC beams. The PS Booster, the first synchrotron in the LHC injection chain, uses three different RF systems (first, second and up to tenth harmonic) in each of its four rings. As part of the LHC Injector Upgrade the current ferrite RF systems will be replaced with broadband Finemet cavities, increasing the flexibility of the RF system. A Finemet test cavity has been installed in Ring 4 to investigate its effect on machine performance, especially beam stability, during extensive experimental studies. Due to large space charge impedance Landau damping is lost through most of the cycle in single harmonic operation, but is recovered when using the second harmonic and controlled longitudinal emittance blow-up. This paper compares beam parameters during acceleration with and without the Finemet test cavity. Comparisons were made using beam measurements and simulations with the BLonD code based on a full PS Booster impedance model. This work, together with simulations of future operation, have provided input for the decision to adopt a fully Finemet RF system.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOY006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOY007 High Energy Booster Options for a Future Circular Collider at CERN 856
 
  • L.S. Stoel, M.J. Barnes, W. Bartmann, F. Burkart, B. Goddard, W. Herr, T. Kramer, A. Milanese, G. Rumolo, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
 
  In case a Future Circular Collider for hadrons (FCC-hh) is constructed at CERN, the tunnels for SPS, LHC and the 100 km collider will be available to house a High Energy Booster (HEB). The different machine options cover a large technology range from an iron-dominated machine in the 100 km tunnel to a superconducting machine in the SPS tunnel. Using a modified LHC as reference, these options are compared with respect to their energy reach, magnet technology and filling time of the collider. Potential issues with beam transfer, reliability and beam stability are presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOY007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOY058 Removing Known SPS Intensity Limitations for High Luminosity LHC Goals 989
 
  • E.N. Shaposhnikova, T. Argyropoulos, T. Bohl, P. Cruikshank, B. Goddard, T. Kaltenbacher, A. Lasheen, J. Perez Espinos, J. Repond, B. Salvant, C. Vollinger
    CERN, Geneva, Switzerland
 
  In preparation of the SPS as an LHC injector its impedance was significantly reduced in 1999 - 2000. A new SPS impedance reduction campaign is planned now for the High Luminosity (HL)-LHC project, which requires bunch intensities twice as high as the nominal one. One of the known intensity limitations is a longitudinal multi-bunch instability with a threshold 3 times below this operational intensity. The instability is presently cured using the 4th harmonic RF system and controlled emittance blow-up, but reaching the HL-LHC parameters cannot be assured without improving the machine impedance. Recently the impedance sources responsible for this instability were identified and implementation of their shielding and damping is foreseen during the next long shutdown (2019 - 2020) in synergy with two other important upgrades: amorphous carbon coating of (part of) the vacuum chamber against the e-cloud effect and rearrangement of the 200 MHz RF system. In this paper the strategy of impedance reduction is presented together with beam intensity achievable after its realisation. The potential effect of other proposals on remaining limitations is also considered.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOY058  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOY059 LHC Injectors Upgrade (LIU) Project at CERN 992
 
  • E.N. Shaposhnikova, J. Coupard, H. Damerau, A. Funken, S.S. Gilardoni, B. Goddard, K. Hanke, L. Kobzeva, A.M. Lombardi, D. Manglunki, S. Mataguez, M. Meddahi, B. Mikulec, G. Rumolo, R. Scrivens, M. Vretenar
    CERN, Geneva, Switzerland
 
  A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LIU roadmap and revised performance objectives of the main upgrades, including the work status and outlook in terms of the required installation and commissioning stages.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOY059  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUOBB03 CERN AWAKE Facility Readiness for First Beam 1071
 
  • C. Bracco, M. Bernardini, A.C. Butterworth, H. Damerau, S. Döbert, V. Fedosseev, E. Feldbaumer, E. Gschwendtner, W. Höfle, A. Pardons, E.N. Shaposhnikova, H. Vincke
    CERN, Geneva, Switzerland
 
  The AWAKE project at CERN was approved in August 2013 and since then a big effort was made to be able to probe the acceleration of electrons before the "2019-2020 Long Shutdown". The next steps in this challenging schedule will be a dry run of all the beam line systems, at the end of the HW commissioning in June 2016, and the first proton beam sent to the plasma cell one month later. The current status of the project is presented together with an outlook over the foreseen works for operation with electrons in 2018.  
slides icon Slides TUOBB03 [10.682 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOBB03  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOR008 Effect of the Various Impedances on Longitudinal Beam Stability in the CERN SPS 1666
 
  • A. Lasheen, T. Argyropoulos, J. Repond, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
 
  The High Luminosity (HL)-LHC project at CERN aims at a luminosity increase by a factor ten and one of the necessary ingredients is doubling the bunch intensity to 2.4x1011 ppb for beams with 25 ns bunch spacing. Many improvements are already foreseen in the frame of the LHC Injector Upgrade (LIU) project, but probably this intensity would still not be reachable in the SPS due to longitudinal instabilities. Recently a lot of effort went into finding the impedance sources of the instabilities. Particle simulations based on the latest SPS impedance model are now able to reproduce the measured instability thresholds and were used to determine the most critical impedance sources by removing them one by one from the model. It was found that impedance of vacuum flanges and of the already damped 630 MHz HOM of the main RF system gave for 72 bunches the comparable intensity thresholds. Possible intensity gains are defined for realistic impedance modifications and for various beam configurations (number of bunches, longitudinal emittances) and RF programs (single and double RF). The results of this study are used as a guideline for planning of a new campaign of the SPS impedance reduction.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOR008  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOR009 Single Bunch Longitudinal Instability in the CERN SPS 1670
SUPSS055   use link to see paper's listing under its alternate paper code  
 
  • A. Lasheen, T. Bohl, S. Hancock, T. Roggen, E.N. Shaposhnikova
    CERN, Geneva, Switzerland
  • E. Radvilas
    Gediminas Technical University, Vilnius, Lithuania
 
  The longitudinal single bunch instability observed in the SPS leads to uncontrolled emittance blow-up and limits the quality of high intensity beams required for the High Luminosity LHC and AWAKE projects at CERN. The present SPS impedance model developed from a thorough survey of machine elements was used in macro-particle simulations (with the code BLonD) of the bunch behavior through the acceleration cycle. Comparison of simulations with measurements of the synchrotron frequency shift, performed on the SPS flat bottom to probe the impedance, show a reasonable agreement. During extensive experimental studies various beam and machine parameters (bunch intensity, longitudinal emittance, RF voltage, with single and double RF systems) were scanned in order to further benchmark the SPS impedance model with measurements and to better understand the mechanism behind the instability. It was found that the dependence of instability threshold on longitudinal emittance and beam energy has an unexpected non-monotonic behavior, leading to islands of (in)stability. The results of this study are presented and can be used to define possible parameter settings for the future CERN projects.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOR009  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMW008 Possible Beam Parameters in Double RF Operation of the CERN LHC 2430
 
  • E.N. Shaposhnikova, J.F. Esteban Müller
    CERN, Geneva, Switzerland
 
  The LHC operates using a 400 MHz SC RF system. A 200 MHz NC RF system was foreseen in the LHC Design Report to improve beam capture and the bare resonators were manufactured, but never installed. Later the second harmonic RF system was proposed to cure longitudinal beam instabilities in the absence of a dedicated wideband feedback system in the LHC. For nominal intensities the longitudinal beam stability is ensured by controlled emittance blow-up during the acceleration ramp. Recently slow growing instabilities were observed at the end of long fills at 6.5 TeV as bunches shrink due to synchrotron radiation damping. For High Luminosity LHC twice higher intensities should be kept stable with new equipment installed in the ring. Additional motivations for a second RF system in the LHC have also been considered. Operation with an extra RF system is limited by the required RF configuration (phase between the two RF systems) and longitudinal beam stability. In this work requirements for the double RF systems are analyzed together with a possible range of longitudinal beam parameters.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMW008  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)