TUOBB03 CERN AWAKE Facility Readiness for First Beam 1071
 
  • C. Bracco, M. Bernardini, A.C. Butterworth, H. Damerau, S. Döbert, V. Fedosseev, E. Feldbaumer, E. Gschwendtner, W. Höfle, A. Pardons, E.N. Shaposhnikova, H. Vincke
    CERN, Geneva, Switzerland
 
  The AWAKE project at CERN was approved in August 2013 and since then a big effort was made to be able to probe the acceleration of electrons before the "2019-2020 Long Shutdown". The next steps in this challenging schedule will be a dry run of all the beam line systems, at the end of the HW commissioning in June 2016, and the first proton beam sent to the plasma cell one month later. The current status of the project is presented together with an outlook over the foreseen works for operation with electrons in 2018.  
slides icon Slides TUOBB03 [10.682 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOBB03  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMY020 Integration of a Terawatt Laser at the CERN SPS Beam for the AWAKE Experiment on Proton-Driven Plasma Wake Acceleration 2592
 
  • V. Fedosseev, M. Battistin, E. Chevallay, N. Chritin, V. Clerc, T. Feniet, F. Friebel, F. Galleazzi, P. Gander, E. Gschwendtner, J. Hansen, C. Heßler, M. Martyanov, A. Masi, A. Pardons, F. Salveter, K.A. Szczurek
    CERN, Geneva, Switzerland
  • M. Martyanov, J.T. Moody, P. Muggli
    MPI-P, München, Germany
 
  In the AWAKE experiment a high-power laser pulse ionizes rubidium atoms inside a 10 m long vapor cell thus creating a plasma for proton-driven wakefield acceleration of electrons. Propagating co-axial with the SPS proton beam the laser pulse seeds the self-modulation instability within the proton bunch on the front of plasma creation. The same laser will also generate UV-pulses for production of a witness electron beam using an RF-photoinjector. The experimental area formerly occupied by CNGS facility is being modified to accommodate the AWAKE experiment. A completely new laser laboratory was built, taking into account specific considerations related to underground work. The requirements for AWAKE laser installation have been fulfilled and vacuum beam lines for delivery of laser beams to the plasma cell and RF-photoinjector have been constructed. First results of laser beam hardware commissioning tests following the laser installation will be presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMY020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMY030 How to Manage a Large Scale Beam Line Consolidation in a Highly Activated Area? 3721
 
  • S. Evrard, J.L. Grenard, E. Harrouch, A. Herve, A. Pardons, Y. Pira, Y.D.R. Seraphin, C. Theis, H. Vincke
    CERN, Geneva, Switzerland
 
  The TDC2/TCC2 consolidation is a good example showing how the complexity of interventions in high radiation areas has increased over the last five years. Due to its duration, its dispersion, the diversity of the teams involved, the fixed deadlines, the risks and external constraints, this worksite prefigures large scale-interventions in the LHC during long shutdown 2 (LS2) and even more LS3. The paper describes the three main project phases: preparation, execution (including monitoring and control) and closure emphasizing the indispensable steps in each stage. It also explains why integrating scope, schedule and dose into a single baseline is of prime importance and shows how to manage and monitor the radiation safety performance of the various interventions throughout the execution phase. Eventually, some recommendations are formulated in order to better accommodate the design of high radiation areas to their operation and maintenance constraints.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPMY030  