Author: Kojima, Y.
Paper Title Page
TUPOW036 Recent Developments and Operational Status of the Compact ERL at KEK 1835
 
  • T. Obina, M. Adachi, S. Adachi, T. Akagi, M. Akemoto, D.A. Arakawa, S. Araki, S. Asaoka, M. Egi, K. Enami, K. Endo, S. Fukuda, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, K. Hozumi, A. Ishii, X.J. Jin, E. Kako, Y. Kamiya, H. Katagiri, R. Kato, H. Kawata, Y. Kobayashi, Y. Kojima, Y. Kondo, T. Konomi, A. Kosuge, T. Kume, T. Matsumoto, H. Matsumura, H. Matsushita, S. Michizono, T. Miura, T. Miyajima, H. Miyauchi, S. Nagahashi, H. Nakai, H. Nakajima, N. Nakamura, K. Nakanishi, K. Nakao, K.N. Nigorikawa, T. Nogami, S. Noguchi, S. Nozawa, T. Ozaki, F. Qiu, H. Sagehashi, H. Sakai, S. Sakanaka, S. Sasaki, K. Satoh, Y. Seimiya, T. Shidara, M. Shimada, K. Shinoe, T. Shioya, T. Shishido, M. Tadano, T. Tahara, T. Takahashi, R. Takai, H. Takaki, T. Takenaka, O. Tanaka, Y. Tanimoto, N. Terunuma, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, J. Urakawa, K. Watanabe, M. Yamamoto, N. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki, Japan
  • R. Hajima, M. Mori, R. Nagai, N. Nishimori, M. Sawamura, T. Shizuma
    QST, Tokai, Japan
  • M. Kuriki
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima, Japan
 
  The Compact Energy Recovery Linac (cERL) at KEK is a test accelerator in order to develop key components to realize remarkable ERL performance as a future light source. After the beam commissioning in December 2013, the legal current limit has been increased step-by-step like 1 uA, 10 uA, and 100 uA. Survey for the source of beam losses has been conducted in each step, and the study on beam dynamics and tuning has also been carried out. As a next step, 1 mA operation is scheduled in February 2016. In parallel to the increase in beam current, a laser Compton scattering (LCS) system which can provide high-flux X-ray to a beamline has been successfully commissioned. We report recent progress in various kinds of beam tuning: improvement of electron gun performance, high bunch charge operation, mitigation of beam losses, LCS optics tuning and bunch compression for THz radiation.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOW036  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMB017 High Gradient Cavity Performance in STF-2 Cryomodule for the ILC at KEK 2158
 
  • Y. Yamamoto, T. Honma, E. Kako, Y. Kojima, T. Matsumoto, H. Nakai, T. Shishido
    KEK, Ibaraki, Japan
 
  The high power test for STF-2 cryomodule has completed successfully in 2015. Before cooldown of cryomodule, at first, the input coupler conditioning at room temperature is done with detuned cavities. After cooldown, the cavity conditioning, which is the main part in the performance test, is done by monitoring the radiation level measured at three locations around the cryomodule, and the heating and RF output at two HOM (Higher Order Mode) couplers. Consequently, it became clear the average accelerating gradient is 30 MV/m for STF-2 cryomodule (39 MV/m at max. and 15 MV/m at min.), and the second cavity string with four cavities had the significant performance degradation by heavy field emission due to the additional clean room work in the STF tunnel. As the following next steps, there are the LFD (Lorenz Force Detuning) measurement, LFD compensation by piezo, and long run for check of stable operation at high gradient. In the long run around 32 MV/m, each cavity without degradation showed the stable operation with the successful LFD compensation by piezo and RF feedback system. In this paper, the detailed test result will be presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB017  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)