  • Y. Funakoshi, T. Abe, T. Adachi, K. Akai, Y. Arimoto, K. Egawa, Y. Enomoto, J.W. Flanagan, H. Fukuma, K. Furukawa, N. Iida, H. Iinuma, H. Ikeda, T. Ishibashi, M. Iwasaki, T. Kageyama, H. Kaji, T. Kamitani, T. Kawamoto, S. Kazama, M. Kikuchi, T. Kobayashi, K. Kodama, H. Koiso, M. Masuzawa, T. Mimashi, T. Miura, F. Miyahara, T. Mori, A. Morita, S. Nakamura, T.T. Nakamura, H. Nakayama, T. Natsui, M. Nishiwaki, K. Ohmi, Y. Ohnishi, T. Oki, S. Sasaki, M. Satoh, Y. Seimiya, K. Shibata, M. Suetake, Y. Suetsugu, H. Sugimoto, M. Tanaka, M. Tawada, S. Terui, M. Tobiyama, S. Uehara, S. Uno, X. Wang, K. Watanabe, Y. Yano, S.I. Yoshimoto, R. Zhang, D. Zhou, X. Zhou, Z.G. Zong
    KEK, Ibaraki, Japan
  • D. El Khechen
    LAL, Orsay, France
 
  In this report, we describe the machine operation in the first 3 months of the Phase 1 commissioning of SuperKEKB. The beam commissioning is smoothly going on. Vacuum scrubbing, the optics corrections and others are described.  
slides icon Slides TUOBA01 [9.346 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOBA01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOW020 Present Status of KEK Photon Factory and Future Project 2871
 
  • T. Honda, M. Adachi, S. Asaoka, K. Haga, K. Harada, Y. Honda, X.J. Jin, T. Kageyama, R. Kato, Y. Kobayashi, K. Marutsuka, T. Miyajima, H. Miyauchi, S. Nagahashi, N. Nakamura, K.N. Nigorikawa, T. Nogami, T. Obina, M. Ono, T. Ozaki, H. Sagehashi, H. Sakai, S. Sakanaka, H. Sasaki, Y. Sato, M. Shimada, T. Shioya, M. Tadano, T. Tahara, T. Takahashi, R. Takai, H. Takaki, O. Tanaka, Y. Tanimoto, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, N. Yamamoto, Ma. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki, Japan
 
  Two synchrotron radiation sources of KEK, the PF-ring and the PF-AR, continue their user operation with various improvements. Scrap and build of the first generation undulators of 1980s at the PF-ring is pushed forward year by year. Five new elliptically polarized undulators have been installed in these five years, and we have also installed four very narrow-gap short-period undulators generating high brilliant X-ray. The new beam transport line that enables the 6.5-GeV full energy injection for PF-AR will be completed by the end of 2016 in order to make the top-up operation of the two SR sources compatible with the continuous injection for two main rings of the Super-KEKB. We have proposed a project of further upgrade of the 2.5-GeV PF-ring to improve its horizontal emittance as 8 nm rad using combined bending magnets at the arc sections. And we are also moving ahead on proposal of constructing a new KEK light source of an extremely low emittance as 0.3 nm rad. The progress and detail of our future project will be described in this paper.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPOW020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)