TUZB02 Challenge of In-vacuum and Cryogenic Undulator Technologies 1080
 
  • J.C. Huang, C.-H. Chang, C.H. Chang, T.Y. Chung, C.-S. Hwang, C.K. Yang, Y.T. Yu
    NSRRC, Hsinchu, Taiwan
  • H. Kitamura
    RIKEN SPring-8 Center, Sayo-cho, Sayo-gun, Hyogo, Japan
 
  An in-vacuum undulator (IVU) opens the utilization of high-brilliance X-rays in the medium energy storage rings. The development of a short-period undulator with low phase error becomes important to bring X-ray into a new unprecedented brilliant light source in an ultimate storage ring (USR). NdFeB or PrFeB cryogenic permanent magnet undulators (CPMUs) with a short period have been developed worldwide to obtain high brilliance of undulator radiation. A CPMU has high resistance against beam-induced heat load and allow to operate at a narrow gap. In a low emittance or ultimate storage ring, not only the performance of an undulator but the choice of the lattice functions is very important to obtain high bril-liance of synchrotron radiation. The optimum betatron functions and zero dispersion function shall be given for a straight section at IVU/CPMUs. In this paper, the relevant factors and design issues for IVU/CPMU will be discussed. Many technological challenges of a short-period undulator associated with beam induced-heat load, phase errors, and the deformation of in-vacuum girders will also be presented herein.  
slides icon Slides TUZB02 [5.204 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUZB02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMB050 The Commmissioning of Phase-I Insertion Devices in TPS 3360
 
  • M.-S. Chiu, C.H. Chang, C.H. Chen, J. Chen, J.Y. Chen, Y.-S. Cheng, P.C. Chiu, P.J. Chou, T.Y. Chung, S. Fann, K.H. Hu, C.H. Huang, J.C. Huang, C.-S. Hwang, C.-C. Kuo, T.Y. Lee, C.C. Liang, Y.-C. Liu, H.-J. Tsai, F.H. Tseng, C.Y. Wu
    NSRRC, Hsinchu, Taiwan
 
  The Taiwan Photon Source (TPS) is a low-emittance 3-GeV light source at Natioal Synchrotron Radiation Research Center, next to the Taiwan Light source (1.5 GeV). On March 26, 2015, the TPS storage ring with two 5-cell PETRA cavities has successfully operated in 100 mA in top-up mode without the installation of insertion devices (IDs). To reach the design goal of 500 mA, the machine was shut down for 5 months to replace PETRA cavitites with superconducting RF (SRF) cavities and to install 10 IDs: 7 in-vacuum undulators (IU) and 3 elliptically polarized undulators (EPU). The commissioning of TPS storage ring with SRF cavities and IDs began in Sep. 2015. In this paper, we present our results and proceedures of ID commissioning.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPMB050  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOW048 Optimization of a Multipole Wiggler for Tps 4050
 
  • J.C. Jan, C.-H. Chang, T.Y. Chung, J.C. Huang, C.-S. Hwang, C.Y. Kuo
    NSRRC, Hsinchu, Taiwan
 
  Taiwan Photon Source (TPS) is a synchrotron radia-tion facility with electron energy 3 GeV that was commissioned in 2015. Taiwan Light Source (TLS) with electron energy 1.5 GeV concurrently provides user time. Three beam lines of TLS supply photons of energy 6-18 keV for user experiments; these beam lines are served with an in-achromatic superconduct-ing wiggler (IASW, 3.1 T). This superconducting inser-tion device has the disadvantages of complicated maintenance and operation. A traditional multipole wiggler (MPW) magnet of hybrid type is hence planned to be installed in TPS to cover the range of photon energy of IASW for user experiments. For the design of the magnetic circuit, the side block and the extreme block are arranged surrounding a Permendur Vanadium cobalt steel pole that enhances the field strength and good field region of a MPW magnet. The dynamic integral field and the demagnetizing field of MPW magnet were estimated. The optimization of the pole dimensions and photon characteristics were simu-lated and are discussed in this work.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOW048  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOW049 Status of Insertion Devices at Taiwan Photon Source 4054
 
  • T.Y. Chung, C.-H. Chang, C.H. Chang, M.-S. Chiu, J.C. Huang, C.-S. Hwang, J.C. Jan, C.-C. Kuo, Y.-C. Liu, F.H. Tseng, C.K. Yang
    NSRRC, Hsinchu, Taiwan
 
  The storage ring of Taiwan Photon Source (TPS) has eighteen short straight sections (length 7 m) and six long straight sections (length 12 m). In phase I, three elliptically polarized undulators of type APPLE II and seven in-vacuum undulators, which included four in-vacuum undulators and two elliptically polarized undulators in three double mini-βy sections, were installed. Commissioning of the insertion devices began in 2015 November. The influence of insertion devices on the electron beam and the results after compensation are presented. Problems during the commissioning induced by the electron beam and by radiation, and their solutions, are also explained. For insertion devices in phase II and for devices developed in TPS, the preliminary designs are presented herein, to cover from the VUV to the hard X-ray region.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOW049  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOW050 Upgrade of Septum Magnets of the Transfer Line in TPS 4057
 
  • C.S. Yang, C.-H. Chang, Y.L. Chu, J.C. Huang, C.-S. Hwang, J.C. Jan, F.-Y. Lin
    NSRRC, Hsinchu, Taiwan
 
  Taiwan Photon Source (TPS) is a 3-GeV light source. The full current of the storage beam and commissioning of insertion devices are still in progress. An improved injection between the booster ring (BR) and the storage ring (SR) was implemented to increase the efficiency of injection and the reliability of the electrical parts. A DC septum (length 0.8 m) was replaced with an AC septum (length 1 m, type C) to decrease the leakage field and to relax the loading of the power supply. Mapping the field with mu-metal shielding was also implemented to diminish the leakage field from the AC septum. The lattice of the transfer line between the booster ring and the storage ring, BTS, was also rearranged to meet the new injection requirements. The performance of the AC septum with mu-metal shielding and the upgrade of the BTS lattice are discussed in this paper.  