Author: Cao, J.S.
Paper Title Page
MOPMB036 Beam Profile Measurement Using Kirkpatrick Baez Mirror Optics at Shanghai Synchrotron Radiation Facility 167
 
  • D.C. Zhu, J.S. Cao, Y.F. Sui, J.H. Yue
    IHEP, Beijing, People's Republic of China
  • J. Chen
    SINAP, Shanghai, People's Republic of China
 
  For the third-generation light sources, the vertical emit-tance of a few pico-meter-radians which can be achieved with good coupling correction close to 0.1%, will lead to very small beam size. Several microns vertical beam sizes measurement has presented challenges for diagnostic capability in this region. A few techniques have been developed to make a precise measurement, such as visible light interferometer, x-ray imaging using Fresnel zone plates, compound refractive lenses or pinhole camera. In this paper, an x-ray reflective optics method based on the Kirkpatrick'Baez mirrors will be emphasis on discussed. The K-B mirror system will be installed and tested in SSRF to obtain the vertical beam size close to 20 microns, which is expected to be used for several microns vertical beam size measurement in the future light source named HEPS (High Energy Photon Source) in China.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPMB036  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEOBA02 Commissioning of the China-ADS Injector-I Testing Facility 2048
 
  • F. Yan, J.S. Cao, Y.L. Chi, R. Ge, H. Geng, S. Gu, D.Z. Guo, T.M. Huang, X. Jing, H. Li, R.L. Liu, F. Long, C. Meng, H.F. Ouyang, W.M. Pan, Q.L. Peng, Y.F. Sui, J.L. Wang, S.C. Wang, Z. Xue, Q. Ye, Y.L. Zhao
    IHEP, Beijing, People's Republic of China
 
  The 10 MeV accelerator-driven subcritical system (ADS) Injector I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at 325 MHz], for the ADS project in China. The ion source was installed since April of 2014, periods of commissioning are regularly scheduled between installation phases of the rest of the injector. 6.05 MeV proton energy has been achieved with average beam current of 10 mA by 7 SC spoke cavities at present. This contribution reports the details of the commissioning results together with the challenges of the CW machine commissioning.  
slides icon Slides WEOBA02 [5.243 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEOBA02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)