Author: Birtwistle, T.W.
Paper Title Page
TUPMW003 Integration, Configuration and Coordination: from Project to Reality, at CERN 1407
 
  • M. Barberan Marin, S. Bartolome-Jimenez, M. Bernardini, T.W. Birtwistle, S. Chemli, J.-P. Corso, J. Coupard, K. Foraz, S. Grillot, Y. Muttoni, A.-L. Perrot
    CERN, Geneva, Switzerland
 
  The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPMW003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)