Upgrade of the LHC Injection Kicker Magnets |
729 |
|
- M.J. Barnes, P. Adraktas, V. Baglin, G. Bregliozzi, S. Calatroni, F. Caspers, H.A. Day, L. Ducimetière, M. Garlaschè, V. Gomes Namora, J.M. Jimenez, N. Magnin, V. Mertens, E. Métral, B. Salvant, M. Taborelli, J.A. Uythoven, W.J.M. Weterings
CERN, Geneva, Switzerland
|
|
|
The two LHC injection kicker systems, comprising 4 magnets per ring, produce a kick of 1.3 T.m with a rise-time of less than 900 ns and a flattop ripple of less than ±0.5%. A beam screen is placed in the aperture of each magnet, to provide a path for the image current of the high intensity LHC beam and screen the ferrite yoke against wake fields. The screen consists of a ceramic tube with conductors in the inner wall. The initially implemented beam screen ensured a low rate of electrical breakdowns while providing an adequate beam coupling impedance. Operation with increasingly higher intensity beams, stable for many hours at a time, now results in substantial heating of the ferrite yoke, sometimes requiring cool down over several hours before the LHC can be refilled. During the long shutdown in 2013/2014 all 8 kicker magnets will be upgraded with an improved beam screen and an increased emissivity of the vacuum tank. In addition equipment adjacent to the injection kickers and various vacuum components will also be modified to help reduce the vacuum pressure in the kickers during high-intensity operation. This paper discusses the upgrades as well as their preparation and planning.
|
|
|
MOPWA031 |
Beam Induced Ferrite Heating of the LHC Injection Kickers and Proposals for Improved Cooling |
732 |
|
- M.J. Barnes, S. Calatroni, F. Caspers, L. Ducimetière, M. Garlaschè, V. Gomes Namora, V. Mertens, Z.K. Sobiech, M. Taborelli, J.A. Uythoven, W.J.M. Weterings
CERN, Geneva, Switzerland
- H.A. Day
UMAN, Manchester, United Kingdom
|
|
|
The two LHC injection kicker systems produce a kick of 1.3 T.m with a flattop duration variable up to 7860 ns, and rise and fall times of less than 900 ns and 3000 ns, respectively. A beam screen is placed in the aperture of each magnet, which consists of a ceramic tube with conductors in the inner wall. The conductors provide a path for the beam image current and screen the ferrite yoke against wake fields. Recent LHC operation, with high intensity beam stable for many hours, resulted in significant heating of both the ferrite yoke and beam impedance reduction ferrites. For one kicker magnet the ferrite yoke approached its Curie temperature. As a result of a long thermal time-constant the ferrites can require several hours to cool enough to re-inject beam, thus limiting the availability of the LHC. Thermal measurement data has been analysed, a thermal model developed and emissivity measurements carried out. The effects of various measures to improve the ferrite cooling have been simulated, including an improved emissivity of the vacuum tank and active cooling on the outside of the tank.
|
|
|
MOPWA032 |
Reduction of Surface Flashover of the Beam Screen of the LHC Injection Kickers |
735 |
|
- M.J. Barnes, P. Adraktas, S. Calatroni, F. Caspers, L. Ducimetière, V. Gomes Namora, V. Mertens, R. Noulibos, M. Taborelli, B. Teissandier, J.A. Uythoven, W.J.M. Weterings
CERN, Geneva, Switzerland
|
|
|
The LHC injection kicker magnets include beam screens to shield the ferrite yokes against wake fields resulting from the high intensity beam. The screening is provided by conductors lodged in the inner wall of a ceramic support tube. Operation with increasingly higher bunch intensity, and narrow bunches, now requires improved ferrite screening. This will be implemented by additional conductors; however the good high-voltage behaviour of the kicker magnets must not be compromised by the supplementary screening. Extensive studies and optimisations have been carried out, to better satisfy the often conflicting requirements for low beam coupling impedance, fast magnetic field rise-time, high vacuum and good high voltage behaviour. A new configuration is proposed which reduces significantly the electric field associated with the screen conductors and the secondary electron yield of the surface of the ceramic tube. Results of high voltage test results are also presented.
|
|
|
MOPWA033 |
Modelling of Parasitic Inductances of a High Precision Inductive Adder for CLIC |
738 |
|
- J. Holma, M.J. Barnes
CERN, Geneva, Switzerland
- S.J. Ovaska
Aalto University, School of Science and Technology, Aalto, Finland
|
|
|
The CLIC study is exploring the scheme for an electron-positron collider with high luminosity and a nominal centre-of-mass energy of 3 TeV. The CLIC pre-damping rings and damping rings will produce, through synchrotron radiation, ultra-low emittance beam with high bunch charge. To avoid beam emittance increase, the damping ring kicker systems must provide extremely flat, high-voltage, pulses. The specifications for the extraction kickers of the DRs are particularly demanding: the flat-top of the pulses must be ±12.5 kV with a combined ripple and droop of not more than ±0.02 % (±2.5 V). An inductive adder is a very promising approach to meeting the specifications. However, the output impedance of the inductive adder needs to be well matched to the system impedance. The primary leakage inductance, which cannot be computed accurately analytically, has a significant effect upon the output impedance of the inductive adder. This paper presents predictions, obtained by modelling the 3D geometry of the adder structure and printed circuit boards using the FastHenry code, for primary leakage inductance.
|
|
|
MOPWO022 |
Design and Manufacturing Description of the Prototype Striplines for the Extraction Kicker of the CLIC Damping Rings |
930 |
|
- C. Belver-Aguilar, A. Faus-Golfe
IFIC, Valencia, Spain
- M.J. Barnes
CERN, Geneva, Switzerland
- J. Gómez
Trinos Vacuum Projects, Paterna, Spain
- D. Gutiérrez Arribas
Trinos Vacuum Projects, S.L., Paterna - Valencia, Spain
- F. Toral
CIEMAT, Madrid, Spain
|
|
|
The Pre-Damping Rings (PDRs) and Damping Rings (DRs) of CLIC are needed to reduce the beam emittances to the small values required for the main linacs. The injection and extraction, from the PDRs and DRs, are carried out by kicker systems. In order to achieve both low beam coupling impedance and reasonable broadband impedance matching to the electrical circuit, striplines have been chosen for the kicker elements. The design of the stripline kicker was previously carried out by modelling the striplines with simulation codes such as HFSS, Quickfield and CST Particle Studio. In order to have a complete analysis of the striplines, the effect of electrodes supports and coaxial feedthroughs have been studied in detail. In this paper, electromagnetic analyses of the complete striplines, including fabrication tolerances, are reported. Furthermore, a new idea for impedance matching is presented.
|
|
|
MOPWO025 |
Optics and Protection of the Injection and Extraction Regions of the CLIC Damping Rings |
939 |
|
- R. Apsimon, B. Balhan, M.J. Barnes, J. Borburgh, B. Goddard, Y. Papaphilippou, J.A. Uythoven
CERN, Geneva, Switzerland
|
|
|
The optics design of the injection and extraction regions for the CLIC damping rings is presented. The design defines the parameters for the kicker magnets and septa in these regions and has been optimised to minimise the length of the insertions within the parameter space of the system. Failure modes of the injection and extraction elements are identified and their severity assessed. Protection elements for the injection and extraction regions are optimised based on the conclusions of the failure mode analysis.
|
|
|
TUPME032 |
Update on Beam Induced RF Heating in the LHC |
1646 |
|
- B. Salvant, O. Aberle, G. Arduini, R.W. Aßmann, V. Baglin, M.J. Barnes, W. Bartmann, P. Baudrenghien, O.E. Berrig, A. Bertarelli, C. Bracco, E. Bravin, G. Bregliozzi, R. Bruce, F. Carra, F. Caspers, G. Cattenoz, S.D. Claudet, H.A. Day, M. Deile, J.F. Esteban Müller, P. Fassnacht, M. Garlaschè, L. Gentini, B. Goddard, A. Grudiev, B. Henrist, S. Jakobsen, O.R. Jones, O. Kononenko, G. Lanza, L. Lari, T. Mastoridis, V. Mertens, N. Mounet, E. Métral, A.A. Nosych, J.L. Nougaret, S. Persichelli, A.M. Piguiet, S. Redaelli, F. Roncarolo, G. Rumolo, B. Salvachua, M. Sapinski, R. Schmidt, E.N. Shaposhnikova, L.J. Tavian, M.A. Timmins, J.A. Uythoven, A. Vidal, J. Wenninger, D. Wollmann, M. Zerlauth
CERN, Geneva, Switzerland
- H.A. Day
UMAN, Manchester, United Kingdom
- L. Lari
IFIC, Valencia, Spain
|
|
|
Since June 2011, the rapid increase of the luminosity performance of the LHC has come at the expense of increased temperature and pressure readings on specific near-beam LHC equipment. In some cases, this beam induced heating has caused delays whilie equipment cools down, beam dumps and even degradation of these devices. This contribution gathers the observations of beam induced heating attributable to beam coupling impedance, their current level of understanding and possible actions that are planned to be implemented during the long shutdown in 2013-2014.
|
|
|
TUPME033 |
Evaluation of the Beam Coupling Impedance of New beam Screen Designs for the LHC Injection Kicker Magnets |
1649 |
|
- H.A. Day
UMAN, Manchester, United Kingdom
- M.J. Barnes, F. Caspers, E. Métral, B. Salvant
CERN, Geneva, Switzerland
- R.M. Jones
Cockcroft Institute, Warrington, Cheshire, United Kingdom
|
|
|
The LHC injection kicker magnets (MKIs) have experienced a significant degree of beam induced heating since the beginning of the 2011 due to the increasing intensity stored in the LHC, for long periods of time, and the relatively large broadband impedance of the installed kicker magnets. In this paper we show the sources of impedance in the MKIs, especially the effect that the beam screen dimensions have on the impedance. We show how these alter the power loss, and present an improved beam screen design that improves shielding on the magnet, whilst further improving electrical breakdown.
|
|
|
TUPWA042 |
Lessons Learned and Mitigation Measures for the CERN LHC Equipment with RF Fingers |
1802 |
|
- E. Métral, O. Aberle, R.W. Aßmann, V. Baglin, M.J. Barnes, O.E. Berrig, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Carra, F. Caspers, H.A. Day, M. Ferro-Luzzi, M.A. Gallilee, C. Garion, M. Garlaschè, A. Grudiev, J.M. Jimenez, O.R. Jones, O. Kononenko, R. Losito, J.L. Nougaret, V. Parma, S. Redaelli, B. Salvant, P.M. Strubin, R. Veness, C. Vollinger, W.J.M. Weterings
CERN, Geneva, Switzerland
|
|
|
Beam-induced RF heating has been observed in several LHC components when the bunch/beam intensity was increased and/or the bunch length reduced. In particular eight bellows, out of the ten double-bellows modules present in the machine in 2011, were found with the spring, which should keep the RF fingers in good electrical contact with the central insert, broken. Following these observations, the designs of all the components of the LHC equipped with RF fingers have been reviewed. The lessons learnt and mitigation measures are presented in this paper.
|
|
|