|
The Shanghai Synchrotron Radiation Facility (SSRF) has been in operation for user experiments in decay mode since May 2009. In the meantime various activities to prepare top-up operation at SSRF, including safety analysis and simulation, dedicated instrumentations and interlocks, control software, radiation measurements, injection optimization and top-up operation tests, have been carried out. In this paper, the progress towards top-up operation at SSRF is described together with its achieved performance.
|
|