Author: Yoshida, M.
Paper Title Page
MOPS058 KEKB Linac Wakefield Studies of Comparing Theoretical Calculation, Simulation and Experimental Measurement* 739
 
  • L. Zang, N. Iida, Y. Ogawa, M. Satoh, M. Yoshida, D.M. Zhou
    KEK, Ibaraki, Japan
 
  For superKEKB, in order to achieve aiming luminosity machine need to run with a nano-beam scheme so that a small beam emittance is critical important. During the beam propagation, the short-range wake field in the accelerating structure will cause the beam instability and emittance growth. In practical, injecting beam with certain offset could compensate wakfield. And beam emittance could be measured by tuning the quadruple known as quadscan method. In this paper, wakefield theoretical calculation, simulation results will be presented. And then the wakefield impact to beam emittance and wakefield compensation will be discussed. Finally, we will show the comparison of the results getting from theoretical calculation and experimental measurement.  
 
TUPS087 Development of Permanent Magnet Focusing for Klystrons 1743
 
  • Y. Iwashita
    Kyoto ICR, Uji, Kyoto, Japan
  • S. Fukuda, T. Matsumoto, S. Michizono, M. Yoshida
    KEK, Ibaraki, Japan
 
  Funding: KEK
Applying permanent magnet technology to beam focusing in klystrons can reduce their power consumption and reliability. These features benefit variety of applications especially for large facilities that use number of klystrons such as ILC. A half scaled model will be available in summer and full model should be available in September. Research and Development status will be reported.
 
 
MOPC156 Operation Test of Distributed RF System with Circulator-less Waveguide Distribution in S1-Global Project at STF/KEK 448
 
  • T. Matsumoto, M. Akemoto, D.A. Arakawa, S. Fukuda, H. Honma, E. Kako, H. Katagiri, S. Matsumoto, H. Matsushita, S. Michizono, T. Miura, H. Nakajima, K. Nakao, T. Shidara, T. Takenaka, Y. Yano, M. Yoshida
    KEK, Ibaraki, Japan
 
  Distributed RF System (DRFS) is one candidate for a single main linac tunnel design of International International Linear Collider (ILC). In the DRFS, more than ten 800-kW klystrons having a modulating anode are operated by a common DC power and a modulation anode modulator. Each klystron feeds its power into two superconducting cavities and its waveguide distribution system is configured without circulators. This DRFS consists of four SC cavities, two klystrons and a modulator was demonstrated in S1-Global project. The results of circulator-less operation in the DRFS will be reported.