Author: Ouyang, H.F.
Paper Title Page
WEPS050 The MEBT Design for the China Accelerator Driven System 2604
 
  • H. Geng, H.F. Ouyang, J. Tang
    IHEP Beijing, Beijing, People's Republic of China
  • Z. Li, S. Pei, F. Yan
    IHEP Beijng, Beijing, People's Republic of China
 
  The Medium Eneryg Beam Transport (MEBT) line plays an important role in transporting and matching the beam from the RFQ exit to the entrance to the next type of acceleration structures while provides enough beam diagnostics for beam commissing and tuning. The beam dynamics design for the 1GeV China Accelerator Driven System (CADS) is making great progress. In this paper, we will describe the design–both element choosing and beam dynamics study of the 3MeV MEBT for the CADS project.  
 
TUXA01 Status and Challenges of the China Spallation Neutron Source 889
 
  • S. Fu, H. Chen, Y.W. Chen, Y.L. Chi, H. Dong, L. Dong, S.X. Fang, K.X. Huang, W. Kang, J. Li, L. Ma, H.F. Ouyang, H. Qu, H. Sun, J. Tang, C.H. Wang, Q.B. Wang, S. Wang, T.G. Xu, Z.X. Xu, X. Yin, C. Zhang, J. Zhang
    IHEP Beijing, Beijing, People's Republic of China
 
  The accelerator complex of China Spallation Neutron Source (CSNS) mainly consists of an H linac of 80 MeV and a rapid-cycling synchrotron of 1.6 GeV. It operates at 25 Hz repetition rate with an initial proton beam power of 100 kW and is upgradeable to 500kW. The project will start construction in the middle of 2011 with a construction period of 6.5 years. The CSNS accelerator is the first large-scale, high-power accelerator project to be constructed in China and thus we are facing a lot of challenges. This paper presents the current status of CSNS project and summarizes the technology development during the past several years.  
slides icon Slides TUXA01 [3.444 MB]