Author: Morishita, T.
Paper Title Page
MOOCB01 Study on the Realignment Plan for J-PARC Linac after the Tohoku Earthquake in Japan 44
 
  • M. Ikegami
    KEK, Ibaraki, Japan
  • T. Morishita
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  A 9.0-magnitude earthquake struck eastern Japan on March 11, 2011, and it gave rise to damages to the buildings of the J-PARC facilities. In particular, the earthquake caused a deformation of the J-PARC linac tunnel resulting an alignment error of several tens of millimeters in both horizontal and vertical directions. It also caused a change in the relative position between the linac and other facilities of J-PARC complex. To restore the beam operation, we should establish a reasonable realignment plan for J-PARC linac taking various constraints into account and possibly tolerating some residual misalignment. In this paper, we show a study on the realignment plan for J-PARC linac including evaluation of the effect of residual misalignment with particle simulations.  
slides icon Slides MOOCB01 [2.659 MB]  
 
TUPS057 Displacement of J-PARC Caused by Megaquake 1662
 
  • M.J. Shirakata, Y. Fujii, T. Ishii, Y. Shirakabe
    KEK, Tsukuba, Japan
  • H. Harada, S. Harjo, T. Iwahashi, S.I. Meigo, T. Morishita, N. Tani
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  Accelerators, beam lines, and experimental halls located in the J-PARC site were displaced by the 2011 off the Pacific coast of Tohoku Earthquake happened on 11th March, whose magnitude was nine, and its following many aftershocks. Site-wide network of measurement points distributed on grounds, buildings, and magnets was surveyed by using GPS survey system, precise digital levels, and laser trackers. The effect from the megaquake was reported for each J-PARC components, such as LINAC, Rapid Cycling Synchrotron (RCS), Main Ring (MR), neutrino and hadron beam lines, and experimental halls.  
 
WEPS049 Floor Deformation of J-PARC Linac after the Tohoku Earthquake in Japan 2601
 
  • T. Morishita, H. Asano
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • M. Ikegami
    KEK, Ibaraki, Japan
 
  J-PARC linac has finalized its precise alignment at the end of summer 2006, and the beam provision to the Rapid Cycling Synchrotron has been started at Sept. 2007. Since then, the deformation of the accelerator tunnel is small enough to keep the soundness of the alignment accuracy. Therefore, the linac has been operated without realignment of the accelerator components for these four years. However, the alignment has seriously been damaged due to the large earthquake at Mar. 11th, 2011 in eastern Japan. Now, work for restoration is being continued. In this paper, the deformation of the linac tunnel floor due to the earthquake is reported. Since then, aftershock happens frequently. We also report the stability of the tunnel floor.