Author: Meddahi, M.
Paper Title Page
TUPS058 HiRadMat: A New Irradiation Facility for Material Testing at CERN 1665
 
  • I. Efthymiopoulos, S. Evrard, H. Gaillard, D. Grenier, C. Heßler, M. Meddahi, A. Pardons, C. Theis, P. Trilhe, H. Vincke
    CERN, Geneva, Switzerland
  • N. Charitonidis
    EPFL, Lausanne, Switzerland
 
  HiRadMat (High Irradiation to Materials) is a new facility under construction at CERN designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies can be tested. The facility uses a 440 GeV proton beam extracted from the CERN SPS with a pulse length of 7.2 μs,  to a maximum pulse energy of 3.4 MJ. In addition to protons, ion beams with an energy of  173.5 GeV/nucleon and a total pulse energy of 21 kJ can be used. The facility is expected to become operational in autumn 2011. The first tests will include candidate materials and prototype assemblies of LHC collimators foreseen to operate at the ultimate LHC beam powers. Experiments on beam windows and high-power target material options, such as tungsten powder, are also planned. The paper will describe the layout and design parameters for the facility and the way experiments can be operated. Ideas on online and post-irradiation tests and instrumentation will be outlined.  
 
TUPZ019 Transverse Emittance Preservation through the LHC Cycle 1843
 
  • V. Kain, B. Goddard, B.J. Holzer, J.M. Jowett, M. Meddahi, T. Mertens, F. Roncarolo
    CERN, Geneva, Switzerland
 
  The preservation of the transverse emittance is crucial for luminosity performance. At the LHC design stage the total allowed emittance increase was set to 7% throughout the LHC cycle. The proton run in 2010 showed that the injectors can provide beams with smaller emittances than nominal and higher bunch intensities. The LHC parameters are well under control and the emittances are kept below nominal until physics. The LHC luminosity goals for the first year of running could therefore be achieved with fewer bunches than initially foreseen. This paper will report on the measured emittance growth at injection from the SPS and the evolution of the emittance through the entire LHC cycle. Sources and possible cures for the observed emittance growth will be discussed.  
 
WEPS017 Plans for the Upgrade of the LHC Injectors 2517
 
  • R. Garoby, S.S. Gilardoni, B. Goddard, K. Hanke, M. Meddahi, M. Vretenar
    CERN, Geneva, Switzerland
 
  The LHC Injectors Upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN accelerator complex for reliably providing beam with the challenging characteristics required by the high luminosity LHC until at least 2030. Based on the work already started on Linac4, PS Booster, PS and SPS, the LIU project coordinates studies and implementation, and interfaces with the High Luminosity LHC (HL-LHC) project which looks after the upgrade of the LHC itself, expected by the end of the present decade. The anticipated beam characteristics are described, as well as the status of the studies and the solutions envisaged for improving the injector performances.  
 
WEPZ031 Accelerator Studies on a Possible Experiment on Proton-driven Plasma Wakefields at CERN 2832
 
  • R.W. Assmann, I. Efthymiopoulos, S.D. Fartoukh, G. Geschonke, B. Goddard, C. Heßler, S. Hillenbrand, M. Meddahi, S. Roesler, F. Zimmermann
    CERN, Geneva, Switzerland
  • A. Caldwell, G.X. Xia
    MPI-P, München, Germany
  • P. Muggli
    MPI, Muenchen, Germany
 
  There has been a proposal by Caldwell et al to use proton beams as drivers for high energy linear colliders. An experimental test with CERN's proton beams is being studied. Such a test requires a transfer line for transporting the beam to the experiment, a focusing section for beam delivery into the plasma, the plasma cell and a downstream beam section for measuring the effects from the plasma and safe disposal of the beam. The work done at CERN towards the conceptual layout and design of such a test area is presented. A possible development of such a test area into a CERN test facility for high-gradient acceleration experiments is discussed.  
 
WEPS019 Study of a Rapid Cycling Synchrotron to Replace the CERN PS Booster 2523
 
  • K. Hanke, O. Aberle, M. E. Angoletta, B. Balhan, W. Bartmann, M. Benedikt, J. Borburgh, D. Bozzini, C. Carli, P. Dahlen, T. Dobers, M. Fitterer, R. Garoby, S.S. Gilardoni, B. Goddard, J. Hansen, T. Hermanns, M. Hourican, S. Jensen, A. Kosmicki, L.A. Lopez Hernandez, M. Meddahi, B. Mikulec, A. Newborough, M. Nonis, S. Olek, M.M. Paoluzzi, S. Pittet, B. Puccio, V. Raginel, I. Ruehl, H.O. Schönauer, L. Sermeus, R.R. Steerenberg, J. Tan, J. Tückmantel, M. Vretenar, M. Widorski
    CERN, Geneva, Switzerland
 
  CERN’s proton injector chain is undergoing a massive consolidation and upgrade program in order to deliver beams meeting the needs of the LHC Luminosity Upgrade. As an alternative to the upgrade of the existing Proton Synchrotron Booster (PSB), the construction of a Rapid Cycling Synchrotron (RCS) has been studied. This machine would replace the PSB and deliver beams to the LHC as well as to CERN’s rich fixed-target physics program. This paper summarizes the outcome of the feasibility study along with a tentative RCS design.  
 
THPZ025 Stability of the LHC Transfer lines 3741
 
  • V. Kain, W. Bartmann, C. Bracco, L.N. Drosdal, B. Goddard, M. Meddahi, J.A. Uythoven, J. Wenninger
    CERN, Geneva, Switzerland
 
  The LHC is filled from the SPS through two 3 km transfer lines. The injected beam parameters need to be well under control for luminosity performance, machine protection and operational efficiency. Small fractions of beam loss on the transfer line collimation system create showers which can trigger the sensitive LHC beam loss monitor system nearby and cause a beam abort during filling. The stability of the transfer line trajectory through the collimators is particularly critical in this respect. This paper will report on the transfer line trajectory stability during the proton run in 2011, correlations with injection losses, correction frequency and the most likely sources for the observed oscillations.  
 
THPS053 Results from the HiRadMat Primary Beam Line Commissioning 3547
 
  • C. Heßler, M. Arruat, J. Bauche, K. Bestmann, J. Blanco, N. Conan, K. Cornelis, I. Efthymiopoulos, H. Gaillard, B. Goddard, D. Grenier, G.G. Gros, A. Habert, L.K. Jensen, V. Kain, G. Le Godec, M. Meddahi, S. Pelletier, P. Pepinster, B. Puccio, C. Theis, P. Trilhe, G. Vandoni, J. Wenninger
    CERN, Geneva, Switzerland
 
  The High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winter technical stop. The paper summarizes the construction phase and describes the results from the beam line commissioning in spring 2011. Beam parameter and aperture measurements are presented, as well as steering tests. A special emphasis has been put on the handling of the exceptionally flexible beam line optics in the control system.  
 
THPS055 Controlling Beamloss at Injection into the LHC 3553
 
  • B. Goddard, F. Alessio, W. Bartmann, P. Baudrenghien, V. Boccone, C. Bracco, M. Brugger, K. Cornelis, B. Dehning, A. Di Mauro, L.N. Drosdal, E.B. Holzer, W. Höfle, R. Jacobsson, V. Kain, M. Meddahi, V. Mertens, A. Nordt, J.A. Uythoven, D. Valuch, S. Weisz, E.N. del Busto
    CERN, Geneva, Switzerland
  • R. Appleby
    UMAN, Manchester, United Kingdom
 
  Losses at injection into the superconducting LHC can adversely affect the machine performance in several important ways. The high injected beam intensity and energy mean that precautions must be taken against damage and quenches, including collimators placed close to the beam in the injection regions. Clean injection is essential, to avoid spurious signals on the sensitive beam loss monitoring system which will trigger beam dumps. In addition, the use of the two injection insertions to house downstream high energy physics experiments brings constraints on permitted beam loss levels. In this paper the sources of injection beam loss are discussed together with the contributing factors and various issues experienced in the first full year of LHC operation. Simulations are compared with measurement, and the implemented and planned mitigation measures and diagnostic improvements are described. An outlook for future LHC operation is given.