Author: Maglioni, C.
Paper Title Page
TUPS038 Design of a Beam Dump for 3 to 100 MeV for the New H Beam in the CERN Linac4 1620
 
  • C. Maglioni
    CERN, Geneva, Switzerland
 
  In this paper the design of a beam dump for the energy range from 3 to 100 MeV is reported. The dump is developed as temporary dump for the commissioning phase of the Linac4 Project, under construction at CERN, and will be installed in different periods to withstand a beam of different intensities and energies, following the chronological assembly of the linac. The dump design and its functionalities, as well as material choice, criticalities and cooling system are described. Finally, the results from the numerical and analytical thermo-mechanical analyses are reported, while the use of the dump also at 160 MeV is investigated.  
 
TUPS070 An Experiment at HiRadMat: Irradiation of High-Z Materials 1698
 
  • J. Blanco, C. Maglioni, R. Schmidt
    CERN, Geneva, Switzerland
  • N.A. Tahir
    GSI, Darmstadt, Germany
 
  Calculations of the impact of dense high intensity proton beams at SPS and LHC into material have been presented in several papers*,**,***. This paper presents the plans for an experiment to validate the theoretical results with experimental data. The experiment will be performed at the High Radiation to Materials (HiRadMat) facility at the CERN-SPS. The HiRadMat facility is dedicated to shock beam impact experiments. It allows testing of accelerator components with respect to the impact of high-intensity pulsed beams. It will provide a 440 GeV proton beam with a focal size down to 0.1 mm, thus providing very dense beam (energy/cross section). The transversal profile of the beam is considered to be Gaussian with a tunable σ from 0.1 mm to 2 mm. This facility will allow to study “high energy density” physics as the energy density will be high enough to create strong coupled plasma in the core of high-Z materials (copper, tungsten) and to produce strong enough shock waves to create a density depletion channel along the beam axis (tunneling effect). The paper introduces the layout of the experiment and the monitoring system to detect tunneling of protons through the target.
* N.A.Tahir et al. HB2010 Proc., Morschach, Switzerland.
** N.A.Tahir et al. NIMA 606(1-2) 2009 186.
*** N.A.Tahir et al. 11th EPAC, Genoa, Italy, 2008, WEPP073.
 
 
TUOAA03 The Linac4 Project at CERN 900
 
  • M. Vretenar, L. Arnaudon, P. Baudrenghien, C. Bertone, Y. Body, J.C. Broere, O. Brunner, M.C.L. Buzio, C. Carli, F. Caspers, J.-P. Corso, J. Coupard, A. Dallocchio, N. Dos Santos, R. Garoby, F. Gerigk, L. Hammouti, K. Hanke, M.A. Jones, I. Kozsar, J.-B. Lallement, J. Lettry, A.M. Lombardi, L.A. Lopez Hernandez, C. Maglioni, S.J. Mathot, S. Maury, B. Mikulec, D. Nisbet, C. Noels, M.M. Paoluzzi, B. Puccio, U. Raich, S. Ramberger, C. Rossi, N. Schwerg, R. Scrivens, G. Vandoni, J. Vollaire, S. Weisz, Th. Zickler
    CERN, Geneva, Switzerland
 
  As the first step of a long-term programme aiming at an increase in the LHC luminosity, CERN is building a new 160 MeV H linear accelerator, Linac4, to replace the ageing 50 MeV Linac2 as injector to the Proton-Synchrotron Booster (PSB). Linac4 is an 86-m long normal-conducting linac made of an H source, a Radio Frequency Quadrupole (RFQ), a chopping line and a sequence of three accelerating structures: a Drift-Tube Linac (DTL), a Cell-Coupled DTL (CCDTL) and a Pi-Mode Structure (PIMS). The civil engineering has been recently completed, and construction of the main accelerator components has started with the support of a network of international collaborations. The low-energy section up to 3 MeV including a 3-m long 352 MHz RFQ entirely built at CERN is in the final construction phase and is being installed on a dedicated test stand. The present schedule foresees beam commissioning of the accelerator in the new tunnel in 2013/14; the moment of connection of the new linac to the CERN accelerator chain will depend on the LHC schedule for long shut-downs.  
slides icon Slides TUOAA03 [10.347 MB]