Paper |
Title |
Page |
TUPZ019 |
Transverse Emittance Preservation through the LHC Cycle |
1843 |
|
- V. Kain, B. Goddard, B.J. Holzer, J.M. Jowett, M. Meddahi, T. Mertens, F. Roncarolo
CERN, Geneva, Switzerland
|
|
|
The preservation of the transverse emittance is crucial for luminosity performance. At the LHC design stage the total allowed emittance increase was set to 7% throughout the LHC cycle. The proton run in 2010 showed that the injectors can provide beams with smaller emittances than nominal and higher bunch intensities. The LHC parameters are well under control and the emittances are kept below nominal until physics. The LHC luminosity goals for the first year of running could therefore be achieved with fewer bunches than initially foreseen. This paper will report on the measured emittance growth at injection from the SPS and the evolution of the emittance through the entire LHC cycle. Sources and possible cures for the observed emittance growth will be discussed.
|
|
|
THOBA01 |
Electron Cloud Observations in LHC |
2862 |
|
- G. Rumolo, G. Arduini, V. Baglin, H. Bartosik, P. Baudrenghien, N. Biancacci, G. Bregliozzi, S.D. Claudet, R. De Maria, J. Esteban Muller, M. Favier, C. Hansen, W. Höfle, J.M. Jimenez, V. Kain, E. Koukovini, G. Lanza, K.S.B. Li, G.H.I. Maury Cuna, E. Métral, G. Papotti, T. Pieloni, F. Roncarolo, B. Salvant, E.N. Shaposhnikova, R.J. Steinhagen, L.J. Tavian, D. Valuch, W. Venturini Delsolaro, F. Zimmermann
CERN, Geneva, Switzerland
- C.M. Bhat
Fermilab, Batavia, USA
- U. Iriso
CELLS-ALBA Synchrotron, Cerdanyola del Vallès, Spain
- N. Mounet, C. Zannini
EPFL, Lausanne, Switzerland
|
|
|
Operation of LHC with bunch trains different spacings has revealed the formation of an electron cloud inside the machine. The main observations of electron cloud build-up are the pressure rise measured at the vacuum gauges in the warm regions, as well as the increase of the beam screen temperature in the cold regions due to an additional heat load. The effects of the electron cloud were also visible as a strong instability and emittance growth affecting the last bunches of longer trains, which could be improved running with higher chromaticity and/or larger transverse emittances. A summary of the 2010 and 2011 observations and measurements and a comparison with existing models will be presented. The efficiency of scrubbing and scrubbing strategies to improve the machine running performance will be also briefly discussed.
|
|
|
Slides THOBA01 [2.911 MB]
|
|
|
THPZ025 |
Stability of the LHC Transfer lines |
3741 |
|
- V. Kain, W. Bartmann, C. Bracco, L.N. Drosdal, B. Goddard, M. Meddahi, J.A. Uythoven, J. Wenninger
CERN, Geneva, Switzerland
|
|
|
The LHC is filled from the SPS through two 3 km transfer lines. The injected beam parameters need to be well under control for luminosity performance, machine protection and operational efficiency. Small fractions of beam loss on the transfer line collimation system create showers which can trigger the sensitive LHC beam loss monitor system nearby and cause a beam abort during filling. The stability of the transfer line trajectory through the collimators is particularly critical in this respect. This paper will report on the transfer line trajectory stability during the proton run in 2011, correlations with injection losses, correction frequency and the most likely sources for the observed oscillations.
|
|
|
THPS053 |
Results from the HiRadMat Primary Beam Line Commissioning |
3547 |
|
- C. Heßler, M. Arruat, J. Bauche, K. Bestmann, J. Blanco, N. Conan, K. Cornelis, I. Efthymiopoulos, H. Gaillard, B. Goddard, D. Grenier, G.G. Gros, A. Habert, L.K. Jensen, V. Kain, G. Le Godec, M. Meddahi, S. Pelletier, P. Pepinster, B. Puccio, C. Theis, P. Trilhe, G. Vandoni, J. Wenninger
CERN, Geneva, Switzerland
|
|
|
The High Radiation to Materials facility (HiRadMat) is a new experimental area at CERN, for studies of the impact of high-intensity pulsed beams on accelerator components and materials. The beam is delivered from the SPS by a new primary beam line, which has been constructed during the 2010/11 winter technical stop. The paper summarizes the construction phase and describes the results from the beam line commissioning in spring 2011. Beam parameter and aperture measurements are presented, as well as steering tests. A special emphasis has been put on the handling of the exceptionally flexible beam line optics in the control system.
|
|
|
THPS055 |
Controlling Beamloss at Injection into the LHC |
3553 |
|
- B. Goddard, F. Alessio, W. Bartmann, P. Baudrenghien, V. Boccone, C. Bracco, M. Brugger, K. Cornelis, B. Dehning, A. Di Mauro, L.N. Drosdal, E.B. Holzer, W. Höfle, R. Jacobsson, V. Kain, M. Meddahi, V. Mertens, A. Nordt, J.A. Uythoven, D. Valuch, S. Weisz, E.N. del Busto
CERN, Geneva, Switzerland
- R. Appleby
UMAN, Manchester, United Kingdom
|
|
|
Losses at injection into the superconducting LHC can adversely affect the machine performance in several important ways. The high injected beam intensity and energy mean that precautions must be taken against damage and quenches, including collimators placed close to the beam in the injection regions. Clean injection is essential, to avoid spurious signals on the sensitive beam loss monitoring system which will trigger beam dumps. In addition, the use of the two injection insertions to house downstream high energy physics experiments brings constraints on permitted beam loss levels. In this paper the sources of injection beam loss are discussed together with the contributing factors and various issues experienced in the first full year of LHC operation. Simulations are compared with measurement, and the implemented and planned mitigation measures and diagnostic improvements are described. An outlook for future LHC operation is given.
|
|
|