Author: Fix, C.
Paper Title Page
WEPS036 First Coupled CH Power Cavity for the FAIR Proton Injector 2565
 
  • R. M. Brodhage, C. Fix, H. Podlech, U. Ratzinger
    IAP, Frankfurt am Main, Germany
  • G. Clemente, L. Groening
    GSI, Darmstadt, Germany
 
  For the research program with cooled antiprotons at FAIR a dedicated 70 MeV, 70 mA proton injector is required. The main acceleration of this room temperature linac will be provided by six CH cavities operated at 325 MHz. Each cavity will be powered by a 2.5 MW Klystron. For the second acceleration unit from 11.5 MeV to 24.2 MeV a 1:2 scaled model has been built. Low level RF measurements have been performed to determine the main parameters and to prove the concept of coupled CH cavities. For this second tank technical and mechanical investigations have been performed in 2010 to develop a complete technical concept for the manufacturing. In Spring 2011, the construction of the first power prototype has started. The main components of this cavity will be ready for measurements in summer 2011. At that time, the cavity will be tested with a preliminary aluminum drift tube structure, which will allow precise frequency and field tuning. This paper will report on the recent technical development and achievements. It will outline the main fabrication steps towards that novel type of proton DTL. Also first low level RF measurements are expected.