MOPV013 A Dynamic Beam Scheduling System for the FAIR Accelerator Facility 138
 
  • S. Krepp, J. Fitzek, H.C. Hüther, R. Mueller, A. Schaller, A. Walter
    GSI, Darmstadt, Germany
 
  The new Accelerator Control System for GSI/FAIR is now being used productively for the GSI accelerator facility. As the central component for online beam orchestration, the Beam Scheduling System (BSS) is situated between the FAIR Settings Management System and the FAIR timing system. Besides device settings, the Settings Management System provides timing schedules for beam production. The primary purpose of the BSS is to define which of the beam schedules are executed by the timing system, how often and in which order. To provide runtime decisions in pre-planned execution options (e.g. skipping of a particular beam), it processes external signals like user input, experiment requests or beam prohibits provided by the interlock system. More recently, advanced features have been added that allow for dynamic execution control required by storage ring mode features such as breakpoints, repetitions, skipping and manipulations. This contribution gives an overview of the Beam Scheduling System including its interfaces.  
poster icon Poster MOPV013 [0.366 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2021-MOPV013  
About • Received ※ 10 October 2021       Revised ※ 01 November 2021       Accepted ※ 03 November 2021       Issue date ※ 11 March 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPV047 Supporting Flexible Runtime Control and Storage Ring Operation with the FAIR Settings Management System 768
 
  • R. Mueller, J. Fitzek, H.C. Hüther, H. Liebermann, D. Ondreka, A. Schaller, A. Walter
    GSI, Darmstadt, Germany
 
  The FAIR Settings Management system has now been used productively for the GSI accelerator facility operating synchrotrons, storage rings, and transfer lines. The system’s core is being developed in a collaboration with CERN, and is based on CERN’s LHC Software Architecture (LSA) framework. At GSI, 2018 was dedicated to integrating the Beam Scheduling System BSS. Major implementations for storage rings were performed in 2019, while 2020 the main focus was on optimizing the performance of the overall control system. Integrating with the BSS allows us to configure the beam execution directly from the settings management system. Defining signals and conditions enables us to control the runtime behavior of the machine. The storage ring mode supports flexible operation with features allowing to pause the machine and execute in-cycle modifications, using concepts like breakpoints, repetitions, skipping, and manipulation. After providing these major new features and their successful productive use, the focus was shifted on optimizing their performance. The performance was analyzed and improved based on real-word scenarios defined by operations and machine experts.  
poster icon Poster WEPV047 [0.692 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2021-WEPV047  
About • Received ※ 09 October 2021       Accepted ※ 23 November 2021       Issue date ※ 22 December 2021  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)