Author: Brede, K.
Paper Title Page
THPV025 A New Timing System for PETRA IV 916
 
  • T. Wilksen, A. Aghababyan, K. Brede, H.T. Duhme, M. Fenner, U. Hurdelbrink, H. Kay, H. Lippek, H. Schlarb
    DESY, Hamburg, Germany
 
  At DESY an upgrade of the PETRA III synchrotron light source towards a fourth-generation, low emittance machine PETRA IV is currently being actively pursued. The realization of this new machine implies a new design of the timing and synchronization system since requirements on beam quality and controls will significantly change from the existing implementation at PETRA III. The technical design phase of the PETRA IV project is in mid-phase and supposed to deliver a Technical Design Report by end of next year. The conceptual layout of the timing system will follow the successful MTCA.4-based approach as in use at the European XFEL. It will be enhanced to meet the requirements of a synchrotron facility and its booster and linac pre-accelerators. We present general concepts of the timing system, its integration into the control system as well as first specifications of the MTCA.4-based hardware components.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2021-THPV025  
About • Received ※ 10 October 2021       Revised ※ 21 October 2021       Accepted ※ 21 November 2021       Issue date ※ 11 January 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)