MOBAUST01 News from ITER Controls - A Status Report 1
 
  • A. Wallander, L. Abadie, F. Di Maio, B. Evrard, J-M. Fourneron, H.K. Gulati, C. Hansalia, J.Y. Journeaux, C.S. Kim, W.-D. Klotz, K. Mahajan, P. Makijarvi, Y. Matsumoto, S. Pande, S. Simrock, D. Stepanov, N. Utzel, A. Vergara-Fernandez, A. Winter, I. Yonekawa
    ITER Organization, St. Paul lez Durance, France
 
  Construction of ITER has started at the Cadarache site in southern France. The first buildings are taking shape and more than 60 % of the in-kind procurement has been committed by the seven ITER member states (China, Europe, India, Japan, Korea, Russia and Unites States). The design and manufacturing of the main components of the machine is now underway all over the world. Each of these components comes with a local control system, which must be integrated in the central control system. The control group at ITER has developed two products to facilitate this; the plant control design handbook (PCDH) and the control, data access and communication (CODAC) core system. PCDH is a document which prescribes the technologies and methods to be used in developing the local control system and sets the rules applicable to the in-kind procurements. CODAC core system is a software package, distributed to all in-kind procurement developers, which implements the PCDH and facilitates the compliance of the local control system. In parallel, the ITER control group is proceeding with the design of the central control system to allow fully integrated and automated operation of ITER. In this paper we report on the progress of design, technology choices and discuss justifications of those choices. We also report on the results of some pilot projects aiming at validating the design and technologies.  
slides icon Slides MOBAUST01 [4.238 MB]  
 
MOPKS029 The CODAC Software Distribution for the ITER Plant Systems 227
 
  • F. Di Maio, L. Abadie, C.S. Kim, K. Mahajan, P. Makijarvi, D. Stepanov, N. Utzel, A. Wallander
    ITER Organization, St. Paul lez Durance, France
 
  Most of the systems that constitutes the ITER plant will be built and supplied by the seven ITER domestic agencies. These plant systems will require their own Instrumentation and Control (I&C) that will be procured by the various suppliers. For improving the homogeneity of these plant system I&C, the CODAC group, that is in charge of the ITER control system, is promoting standardized solutions at project level and makes available, as a support for these standards, the software for the development and tests of the plant system I&C. The CODAC Core System is built by the ITER Organization and distributed to all ITER partners. It includes the ITER standard operating system, RHEL, and the ITER standard control framework, EPICS, as well as some ITER specific tools, mostly for configuration management, and ITER specific software modules, such as drivers for standard I/O boards. A process for the distribution and support is in place since the first release, in February 2010, and has been continuously improved to support the development and distribution of the following versions.  
poster icon Poster MOPKS029 [1.209 MB]