Author: Allison, S.
Paper Title Page
WEPMN032 Development of Pattern Awareness Unit (PAU) for the LCLS Beam Based Fast Feedback System 954
 
  • K.H. Kim, S. Allison, D. Fairley, T.M. Himel, P. Krejcik, D. Rogind, E. Williams
    SLAC, Menlo Park, California, USA
 
  LCLS is now successfully operating at its design beam repetition rate of 120 Hz, but in order to ensure stable beam operation at this high rate we have developed a new timing pattern aware EPICS controller for beam line actuators. Actuators that are capable of responding at 120 Hz are controlled by the new Pattern Aware Unit (PAU) as part of the beam-based feedback system. The beam at the LCLS is synchronized to the 60 Hz AC power line phase and is subject to electrical noise which differs according to which of the six possible AC phases is chosen from the 3-phase site power line. Beam operation at 120 Hz interleaves two of these 60 Hz phases and the feedback must be able to apply independent corrections to the beam pulse according to which of the 60 Hz timing patterns the pulse is synchronized to. The PAU works together with the LCLS Event Timing system which broadcasts a timing pattern that uniquely identifies each pulse when it is measured and allows the feedback correction to be applied to subsequent pulses belonging to the same timing pattern, or time slot, as it is referred to at SLAC. At 120 Hz operation this effectively provides us with two independent, but interleaved feedback loops. Other beam programs at the SLAC facility such as LCLS-II and FACET will be pulsed on other time slots and the PAUs in those systems will respond to their appropriate timing patterns. This paper describes the details of the PAU development: real-time requirements and achievement, scalability, and consistency. The operational results will also be described.  
poster icon Poster WEPMN032 [0.430 MB]