Author: Abadie, L.
Paper Title Page
MOBAUST01 News from ITER Controls - A Status Report 1
 
  • A. Wallander, L. Abadie, F. Di Maio, B. Evrard, J-M. Fourneron, H.K. Gulati, C. Hansalia, J.Y. Journeaux, C.S. Kim, W.-D. Klotz, K. Mahajan, P. Makijarvi, Y. Matsumoto, S. Pande, S. Simrock, D. Stepanov, N. Utzel, A. Vergara-Fernandez, A. Winter, I. Yonekawa
    ITER Organization, St. Paul lez Durance, France
 
  Construction of ITER has started at the Cadarache site in southern France. The first buildings are taking shape and more than 60 % of the in-kind procurement has been committed by the seven ITER member states (China, Europe, India, Japan, Korea, Russia and Unites States). The design and manufacturing of the main components of the machine is now underway all over the world. Each of these components comes with a local control system, which must be integrated in the central control system. The control group at ITER has developed two products to facilitate this; the plant control design handbook (PCDH) and the control, data access and communication (CODAC) core system. PCDH is a document which prescribes the technologies and methods to be used in developing the local control system and sets the rules applicable to the in-kind procurements. CODAC core system is a software package, distributed to all in-kind procurement developers, which implements the PCDH and facilitates the compliance of the local control system. In parallel, the ITER control group is proceeding with the design of the central control system to allow fully integrated and automated operation of ITER. In this paper we report on the progress of design, technology choices and discuss justifications of those choices. We also report on the results of some pilot projects aiming at validating the design and technologies.  
slides icon Slides MOBAUST01 [4.238 MB]  
 
MOMAU005 Integrated Approach to the Development of the ITER Control System Configuration Data 52
 
  • D. Stepanov, L. Abadie
    ITER Organization, St. Paul lez Durance, France
  • J. Bertin, G. Bourguignon, G. Darcourt
    Sopra Group, Aix-en-Provence, France
  • O. Liotard
    TCS France, Puteaux, France
 
  ITER control system (CODAC) is steadily going into the implementation phase. A design guidelines handbook and a software development toolkit, named CODAC Core System, were produced in February 2011. They are ready to be used off-site, in the ITER domestic agencies and associated industries, in order to develop first control "islands" of various ITER plant systems. In addition to the work done off-site there is wealth of I&C related data developed centrally at ITER, but scattered through various sources. These data include I&C design diagrams, 3-D data, volume allocation, inventory control, administrative data, planning and scheduling, tracking of deliveries and associated documentation, requirements control, etc. All these data have to be kept coherent and up-to-date, with various types of cross-checks and procedures imposed on them. A "plant system profile" database, currently under development at ITER, represents an effort to provide integrated view into the I&C data. Supported by a platform-independent data modeling, done with a help of XML Schema, it accumulates all the data in a single hierarchy and provides different views for different aspects of the I&C data. The database is implemented using MS SQL Server and Java-based web interface. Import and data linking services are implemented using Talend software, and the report generation is done with a help of MS SQL Server Reporting Services. This paper will report on the first implementation of the database, the kind of data stored so far, typical work flows and processes, and directions of further work.  
slides icon Slides MOMAU005 [0.384 MB]  
poster icon Poster MOMAU005 [0.692 MB]  
 
MOPKS029 The CODAC Software Distribution for the ITER Plant Systems 227
 
  • F. Di Maio, L. Abadie, C.S. Kim, K. Mahajan, P. Makijarvi, D. Stepanov, N. Utzel, A. Wallander
    ITER Organization, St. Paul lez Durance, France
 
  Most of the systems that constitutes the ITER plant will be built and supplied by the seven ITER domestic agencies. These plant systems will require their own Instrumentation and Control (I&C) that will be procured by the various suppliers. For improving the homogeneity of these plant system I&C, the CODAC group, that is in charge of the ITER control system, is promoting standardized solutions at project level and makes available, as a support for these standards, the software for the development and tests of the plant system I&C. The CODAC Core System is built by the ITER Organization and distributed to all ITER partners. It includes the ITER standard operating system, RHEL, and the ITER standard control framework, EPICS, as well as some ITER specific tools, mostly for configuration management, and ITER specific software modules, such as drivers for standard I/O boards. A process for the distribution and support is in place since the first release, in February 2010, and has been continuously improved to support the development and distribution of the following versions.  
poster icon Poster MOPKS029 [1.209 MB]