Author: Chang, S.-S.
Paper Title Page
S03SRD11 Status Report on Control System Development for PLS 147
 
  • S.C. Won, S.-S. Chang, J. Huang, J.W. Lee, J. Lee, J.H. Kirn
    PAL, Pohang, Kyungbuk, Republic of Korea
 
  Funding: Work supported by Pohang Iron & Steel Co., Ltd. (POSCO) and Ministry of Science and Technology (MOST), Government of Republic of Korea.
Emphasizing reliability and flexibility, hierarchical architecture with distributed computers have been designed into the Pohang Light Source (PLS) computer control system. The PLS control system has four layers of computer systems connected via multiple data communication networks. This paper presents an overview of the PLS control system. The accelerator control system provides means for accessing all machine components so that the whole system could be monitored and controlled remotely. These tasks include setting magnet currents, collecting status data from the vacuum subsystem, taking orbit data with beam position monitors, feedback control of electron beam orbit, regulating the safety interlock monitors, and so forth. To design a control system which can perform these functions satisfactorily, certain basic design requirements must be fulfilled. Among these are reliability, capability, expa.nsibility, cost control, and ease of operation.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS1991-S03SRD11  
About • Received ※ 11 November 1991 — Accepted ※ 20 November 1991 — Issued ※ 04 December 1992  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
S10TS02 Injection Timing System for PLS 349
 
  • S.-S. Chang, S.J. Choi, M.S. Kim, W. Namkung, S.Y. Park, S.C. Won
    PAL, Pohang, Republic of Korea
 
  The ultimate goal of the PLS timing system is to successfully inject a electron bunch to a predesigned bucket in the Storage Ring. In the Linac, a pretrigger of 102.8 microseconds prior to the Gun trigger may be required to charge the pulsed divces properly and it should be precisely delayed to synchronize with beam pass at each accelerating column. To inject the electron bunch, which fully accelerated in the Linac, into a target bucket of SR, the injection kicker magnets must be energized to provide the appropriate magnetic field. For the sequential filling of the SR buckets, the appropriate timing delays throughout the entire timing system are programmable controlled by operator.  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS1991-S10TS02  
About • Received ※ 11 November 1991 — Accepted ※ 20 November 1991 — Issued ※ 04 December 1992  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)