A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Bjorklund, E.

Paper Title Page
WPPA05 The LANSCE Timing System Upgrade 325
 
  • E. Bjorklund
    LANL, Los Alamos, New Mexico
 
  As part of a planned upgrade project for the Los Alamos Neutron Science Center (LANSCE) accelerator, we are considering replacing our current timing system, which distributes each timing signal on its own dedicated wire, with a more modern event-driven system. This paradigm shift in how timing signals are generated and distributed presents several challenges that must be overcome if we are to preserve our current operational capabilities. This paper will discuss some of the problems and possible solutions involved with migrating to an event system. It will also discuss some recent enhancements to theμResearch, Finland (MRF) event system that will help us accomplish our goal.