Author: Scarpine, V.E.
Paper Title Page
WEP024 A Simulation of the Photoionization of H Together With the Subsequent Tracking of the Liberated Electrons 400
 
  • R.M. Thurman-Keup, M. El Baz, V.E. Scarpine
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work was produced by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy.
The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H ions to 800 MeV kinetic energy before injection into the existing Booster ring. Measurements of the profile of the beam along the LINAC must be done by non-intercepting methods due to the superconducting cavities. The method chosen is photoionization of a small number of H by a focused infrared laser, aka laserwire. The number of ionized electrons is measured as a function of laser position within the H beam. To aid in the design of the collection mechanism, a simulation was written in MATLAB with input from the commercial electromagnetic simulation, CST. This simulation calculates the number and positions of the liberated electrons and tracks them through the magnetic collection and H beam fields to the collection point. Results from this simulation for various points along the LINAC will be shown.
 
poster icon Poster WEP024 [7.451 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP024  
About • Received ※ 08 September 2023 — Revised ※ 10 September 2023 — Accepted ※ 12 September 2023 — Issue date ※ 30 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP033 A Schottky Tune Meter for the Fermilab Mu2E Delivery Ring 425
 
  • V.E. Scarpine, B.J. Fellenz, A. Semenov, D. Slimmer
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359.
The Mu2E experiment will measure the ratio of the rate of the neutrinoless, coherent conversion of muons into electrons as a measure of Charged Lepton Flavor Violation. As part of the Mu2E experiment, a proton storage ring, called the Delivery Ring, will utilize resonant extraction to slow-spill protons to the experiment. To regulate and optimize the Delivery Ring resonant extraction process, a fast tune measurement scheme will be required. This Mu2E tune meter will measure the average tune and the tune spectrum, in multiple time slices, through the entire resonant extraction cycle of nominally 43 msec. The Mu2E tune meter utilizes vertical and horizontal 21.4 MHz Schottky detector resonant pickups, taken from the decommissioned Tevatron, as well as its receiver electronics. This paper will present the design of this Schottky tune meter as well as tune measurements from the Mu2E Delivery Ring.
 
poster icon Poster WEP033 [2.011 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP033  
About • Received ※ 12 September 2023 — Revised ※ 14 September 2023 — Accepted ※ 29 September 2023 — Issue date ※ 29 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)