Author: Bergman, E.C.
Paper Title Page
TU1I02 Beam Instrumentation Performance During Commissioning of the ESS Normal Conducting LINAC 136
 
  • I.D. Kittelmann, R.A. Baron, E.C. Bergman, E.M. Donegani, V. Grishin, H. Hassanzadegan, H. Kocevar, N. Milas, R. Miyamoto, M. Mohammednezhad, F. Nilen, D. Noll, K.E. Rosengren, T.J. Shea, R. Tarkeshian, C.A. Thomas
    ESS, Lund, Sweden
 
  Once constructed, the European Spallation Source (ESS) will be a 5MW pulsed neutron source based on a 2 GeV proton linac delivering 2.86 ms long pulses at a 14 Hz repetition rate. This paper focuses on the beam instrumentation performance during the recent linac beam commissioning up to drift tube linac (DTL) tank 4 with 74 MeV output energy. Instrumentation and measurement results will be presented for beam parameters such as current, position, energy, emittance and beam loss.
Proposal by Peter, same proposal as ID 1283 by Wim. Alternative speaker Cyrille Thomas (ESS).
 
slides icon Slides TU1I02 [6.143 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-TU1I02  
About • Received ※ 07 September 2023 — Revised ※ 08 September 2023 — Accepted ※ 13 September 2023 — Issue date ※ 01 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)