Author: Shemyakin, A.V.
Paper Title Page
TUPP40 Bunch Extinction Measurements at PIP-II Injector Test Facility 309
 
  • M. El Baz
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • B.J. Fellenz, V.E. Scarpine, A.V. Shemyakin, R.M. Thurman-Keup
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359
The PIP2 particle accelerator is a new upgrade to the Fermilab accelerator complex, featuring an 800-MeV H-superconducting linear accelerator that will inject the beam into the present Fermilab Booster. A test accelerator known as PIP-II Injector Test (PIP2IT) has been built to validate the concept of the front-end of such a machine. One of the paramount challenges of PIP2IT was to validate the bunch by bunch chopping system in the Medium Energy Beam Transport (MEBT). This paper aims to present the direct extinction measurements at PIP2IT and their analysis. These measurements have been taken by two Resistive Wall Current Monitors (RWCM) and recorded by a high bandwidth oscilloscope.
 
poster icon Poster TUPP40 [0.603 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2021-TUPP40  
About • paper received ※ 07 September 2021       paper accepted ※ 28 September 2021       issue date ※ 09 October 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)