TUIPI1 | An Operationally Integrated Approach to the SNS 2.8 MW Power Upgrade | 156 |
|
||
Funding: This research used resources at the Spallation Neutron Source, a DOE Office of Science User Facility operated by the Oak Ridge National Laboratory. The SNS accelerator consist of a 1 GeV H⁻ linac and an accumulator ring producing a 1.4 MW pulsed proton beam which drives a spallation neutron source. The Proton Power Upgrade project will double the power capability from 1.4 to 2.8 MW by increasing the linac energy 30% and the beam current about 50%. Equipment upgrades include new superconducting RF cryomodules and supporting RF equipment, upgraded ring equipment, and upgraded high power target systems. An important aspect of the upgrade is a gradual power ramp-up starting in 2022 in which new equipment is installed during maintenance outages as it arrives. |
||
![]() |
Slides TUIPI1 [3.795 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-HB2021-TUIPI1 | |
About • | Received ※ 03 October 2021 — Revised ※ 19 October 2021 — Accepted ※ 02 November 2021 — Issued ※ 24 November 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |