Author: Galambos, J.
Paper Title Page
TUIPI1 An Operationally Integrated Approach to the SNS 2.8 MW Power Upgrade 156
 
  • J. Galambos
    ORNL, Oak Ridge, Tennessee, USA
 
  Funding: This research used resources at the Spallation Neutron Source, a DOE Office of Science User Facility operated by the Oak Ridge National Laboratory.
The SNS accelerator consist of a 1 GeV H⁻ linac and an accumulator ring producing a 1.4 MW pulsed proton beam which drives a spallation neutron source. The Proton Power Upgrade project will double the power capability from 1.4 to 2.8 MW by increasing the linac energy 30% and the beam current about 50%. Equipment upgrades include new superconducting RF cryomodules and supporting RF equipment, upgraded ring equipment, and upgraded high power target systems. An important aspect of the upgrade is a gradual power ramp-up starting in 2022 in which new equipment is installed during maintenance outages as it arrives.
 
slides icon Slides TUIPI1 [3.795 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-TUIPI1  
About • Received ※ 03 October 2021 — Revised ※ 19 October 2021 — Accepted ※ 02 November 2021 — Issued ※ 24 November 2021
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)