Author: Bartosik, H.
Paper Title Page
MOP06 Resonance Compensation for High Intensity and High Brightness Beams in the CERN PSB 40
 
  • F. Asvesta, S.C.P. Albright, F. Antoniou, H. Bartosik, C. Bracco, G.P. Di Giovanni, E.H. Maclean, B. Mikulec, T. Prebibaj, E. Renner
    CERN, Meyrin, Switzerland
 
  Resonance studies have been conducted during the recommissioning of the CERN Proton Synchrotron Booster (PSB) following the implementation of the LHC Injectors Upgrade (LIU) project. In particular, resonance identification through so-called loss maps has been applied on all four rings of the PSB, revealing various resonances up to fourth order. In a second step, compensation schemes for the observed resonances were developed using a combination of analytical methods, experimental data and machine learning tools. These resonance compensation schemes have been deployed in operation to minimize losses for reaching high intensity and high brightness, thereby achieving the target brightness for the LHC-type beams.  
video icon
        Right click on video for
Picture-in-Picture mode
or Full screen display.

At start the sound is muted!
 
poster icon Poster MOP06 [1.923 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-MOP06  
About • Received ※ 05 October 2021 — Revised ※ 17 October 2021 — Accepted ※ 22 November 2021 — Issued ※ 27 November 2021
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP12 Understanding of the CERN-SPS Horizontal Instability with Multiple Bunches 77
 
  • C. Zannini, H. Bartosik, M. Carlà, K.S.B. Li, E. Métral, G. Rumolo, B. Salvant
    CERN, Geneva, Switzerland
  • L.R. Carver
    ESRF, Grenoble, France
  • M. Schenk
    EPFL, Lausanne, Switzerland
 
  At the end of 2018, an instability with multiple bunches has been consistently observed during high intensity studies at the CERN-SPS. This instability could be a significant limitation to achieve the bunch intensity expected after the LHC Injector Upgrade (LIU). Therefore, a deep understanding of the phenomena is essential to identify the best mitigation strategy. Extensive simulation studies have been performed to explore the consistency of the current SPS model, give a possible interpretation of the instability mechanism and outline some possible cures.  
video icon
        Right click on video for
Picture-in-Picture mode
or Full screen display.

At start the sound is muted!
 
poster icon Poster MOP12 [1.454 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-MOP12  
About • Received ※ 07 October 2021 — Revised ※ 20 October 2021 — Accepted ※ 28 December 2021 — Issued ※ 11 April 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP14 The PS Booster Alignment Campaign and a New Tune Control Implementation After the LHC Injectors Upgrade at CERN 89
 
  • F. Antoniou, F. Asvesta, H. Bartosik, J.F. Comblin, G.P. Di Giovanni, M. Hostettler, A. Huschauer, B. Mikulec, J.-M. Nonglaton, T. Prebibaj
    CERN, Meyrin, Switzerland
 
  The CERN PS Booster (PSB) has gone through major upgrades during the Long Shutdown 2 (LS2) and the recommissioning with beam started in December 2020. Two of the aspects leading to improved operation will be described in this paper: a new tune control implementation; and a full re-alignment campaign. The operation of the PSB requires a large range of working points to be accessible along the acceleration cycle. As part of the LIU project, the PSB main power supply was upgraded to raise the extraction energy from 1.4 GeV to 2 GeV, in order to improve the brightness reach of the downstream machines. A new tune control implementation was necessary to take into account saturation effects of the bending magnets and the reconfiguration of the main circuits, as well as the additional complexity of the new H⁻ charge exchange injection. The first part of the paper describes the implementation of the new tune control and its experimental verification and optimization. The second part describes the results of the PSB alignment campaign after LS2, giving emphasis to the method developed to perform a combined closed orbit correction through quadrupole alignments.  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-MOP14  
About • Received ※ 18 October 2021 — Revised ※ 19 November 2021 — Accepted ※ 25 March 2022 — Issued ※ 11 April 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP18 Injection Chicane Beta-Beating Correction for Enhancing the Brightness of the CERN PSB Beams 112
 
  • T. Prebibaj, S.C.P. Albright, F. Antoniou, F. Asvesta, H. Bartosik, C. Bracco, G.P. Di Giovanni, E.H. Maclean, B. Mikulec, E. Renner
    CERN, Meyrin, Switzerland
  • T. Prebibaj
    IAP, Frankfurt am Main, Germany
 
  In the context of the LHC Injectors Upgrade Project (LIU), the Proton Synchrotron Booster (PSB) developed an H⁻ charge exchange injection system. The four short rectangular dipoles of the injection chicane induce focusing errors through edge focusing and Eddy currents. These errors excite the half-integer resonance 2Qy = 9 and cause a dynamically changing beta-beating in the first milliseconds after injection. Using the beta-beating at the positions of two individually powered quadrupoles, measured with k-modulation, correction functions based on a model response matrix have been calculated and applied. Minimizing the beta-beating at injection allows the machine to be operated with betatron tunes closer to the half-integer resonance and therefore with larger space charge tune spreads. In this contribution the results of the beta-beating compensation studies and the impact on the achievable beam brightness limit of the machine are presented.  
video icon
        Right click on video for
Picture-in-Picture mode
or Full screen display.

At start the sound is muted!
 
poster icon Poster MOP18 [1.322 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-MOP18  
About • Received ※ 04 October 2021 — Revised ※ 01 November 2021 — Accepted ※ 05 February 2022 — Issued ※ 11 April 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP19 Optimised Transverse Painting Schemes for the New 160 MeV H⁻ Injection System at CERN 118
 
  • E. Renner, S.C.P. Albright, F. Antoniou, F. Asvesta, H. Bartosik, C. Bracco, G.P. Di Giovanni, B. Mikulec, T. Prebibaj, F.M. Velotti
    CERN, Meyrin, Switzerland
 
  A major aspect of the LHC Injectors Upgrade (LIU) project at CERN is the Proton Synchrotron Booster (PSB) connection to the newly built Linac4 and the related installation of a new 160 MeV H⁻ charge exchange injection. This contribution presents the first operational experience with the new injection system and its flexibility of applying horizontal phase space painting to tailor different beams to the respective user-defined brightness targets. The presented measurement and multi-particle simulation results focus on the optimisation of the required transverse injection settings to reduce losses when producing high-intensity beams, i.e. for the ISOLDE experiment. In this context, feasibility studies towards applying numerical optimisation algorithms for improving and efficiently adapting the respective injection settings online are presented.  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-MOP19  
About • Received ※ 17 October 2021 — Revised ※ 19 October 2021 — Accepted ※ 20 November 2021 — Issued ※ 12 April 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUAC2 Impact of Power Supply Ripple on the Beam Performance of the Large Hadron Collider and the High-Luminosity LHC 170
 
  • S. Kostoglou, H. Bartosik, Y. Papaphilippou, G. Sterbini
    CERN, Geneva, Switzerland
 
  Harmonics of the mains frequency (50 Hz) have been systematically observed in the form of dipolar excitations in the transverse beam spectrum of the Large Hadron Collider (LHC) since the beginning of its operation. The power supply ripple, consisting of both fundamental and higher frequency components, is proven not to be the result of an artifact of the instrumentation systems with which they are observed. Potential sources of the perturbation have been identified through systematic analysis and experimental studies. Single-particle tracking simulations have been performed including a realistic power supply ripple spectrum, as acquired from experimental observations, to demonstrate the impact of such noise effects on beam performance.  
slides icon Slides TUAC2 [3.678 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-TUAC2  
About • Received ※ 04 October 2021 — Revised ※ 20 October 2021 — Accepted ※ 23 November 2021 — Issued ※ 25 February 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)