TUA2WC01 | Discussion on SARAF-LINAC Cryomodules | 80 |
|
||
CEA is in charge of the design, construction, installation and commissioning at SNRC of the Linac of the SARAF project. The linac is composed of an MEBT and a Superconducting linac (SCL) integrating 4 cryomodules. Nowadays, the HWR cavities and superconducting magnets prototypes are being built. The Critical Design Review of the cryomodules has just been passed in March 2018. This paper present the status of the SARAF-LINAC cryomodules. | ||
![]() |
Slides TUA2WC01 [14.245 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-HB2018-TUA2WC01 | |