Paper | Title | Other Keywords | Page |
---|---|---|---|
MOPM1P80 | Accelerator Physics Challenges in FRIB Driver Linac | ion, linac, simulation, ion-source | 27 |
|
|||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 FRIB is a heavy ion linac facility to accelerate all stable ions to the energy of 200 MeV/u with the beam power of 400 kW, which is under construction at Michigan State University in USA. FRIB driver linac is a beam power frontier accelerator aiming to realize two orders of magnitude higher beam power than existing facilities. It consists of more than 300 low-beta superconducting cavities with unique folded layout to fit into the existing campus with innovative features including multi charge state acceleration. In this talk, we overview accelerator physics challenges in FRIB driver linac with highlight on recent progresses and activities preparing for the coming beam commissioning. |
|||
![]() |
Slides MOPM1P80 [22.790 MB] | ||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
MOPR008 | Pressure Profiles Calculation for the CSRm and BRing | ion, vacuum, dipole, simulation | 62 |
|
|||
Funding: National Natural Science Foundation of China (Project No. 11305227) A new large scale accelerator facility is being designed by Institute of Modern Physics (IMP) Lanzhou, which is named as the High Intensity heavy-ion Accelerator Facility (HIAF). This project consists of ion sources, Linac accelerator, synchrotrons (BRing) and several experimental terminals. During the operation of Bring, the heavy ion beams will be easily lost at the vacuum chamber along the BRing when it is used to accumulate intermediate charge state particles. The vacuum pressure bump due to the ion-induced desorption in turn leads to an increase in beam loss rate. In order to accumulate the beams to higher intensity to fulfill the requirements of physics experiments and for better understanding of the dynamic vacuum pressure caused by the beam loss, a dynamic vacuum pressure simulation program has been developed. Vacuum pressure profiles are calculated and compared with the measured data based on the current synchrotron (CSRm). Then the static vacuum pressure profiles of the BRing and one type of pump which will be used in the BRing are introduced in this paper. |
|||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||