Author: Perrot, L.
Paper Title Page
MOPL002 The DESIR Facility at GANIL-SPIRAL2: The Transfer Beam Lines 179
 
  • L. Perrot, P. Blache, S. Rousselot
    IPN, Orsay, France
 
  Funding: French ANR, Investissements d'Avenir, EQUIPEX. Contract number ANR-11-EQPX-0012.
The new ISOL facility SPIRAL2 is currently being built at GANIL, Caen France. The commissioning of the accelerator is in progress since 2015. SPIRAL2 will produce a large number of new radioactive ion beams (RIB) at high intensities. In 2019, the DESIR facility will receive beams from the upgraded SPIRAL1 facility of GANIL (stable beam and target fragmentation), from the S3 Low Energy Branch (fusion-evaporation and deep-inelastic reactions). In order to deliver the RIB to the experimental set-ups installed in the DESIR hall, 110 meters of beam line are studied since 2014. This paper will focus on the recent studies which have been done on these transfer lines: beam optics and errors calculations, quadrupoles, diagnostics and mechanical designs.
 
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRAM4P01
Summary WG-C  
 
  • L. Perrot
    IPN, Orsay, France
  • S.M. Cousineau
    ORNL, Oak Ridge, Tennessee, USA
 
  Friday Summary  
slides icon Slides FRAM4P01 [3.484 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)