Paper | Title | Page |
---|---|---|
MOP15 | Study of noble gas memory effect of ECR3 at ATLAS | 64 |
|
||
Funding: This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract No. DE-AC02-06CH11357. Over the past three decades a portion of the accelerated beam time at the Argonne Tandem Linac Accelerator System (ATLAS) has been reserved for ultra-sensitive detection of argon radioisotopes. A unique noble-gas accelerator mass spectrometry (NOGAMS) technique [1] at ATLAS combines electron cyclotron resonance ion source (ECRIS) positive ion production, acceleration up to ~6 MeV/u and detection methods for separating isobars and other m/q contaminants. The ECR3 ion source was chosen for such experiments due to the limited scope of material introduced into the plasma chamber, inferring a lower background production compared to ECR2. A recent ³⁹⸴⁴²Ar NOGAMS experiment has highlighted a need to understand the beam production of material that is no longer being actively introduced into the ECRIS, known as memory effect. A quantitative study of source memory was performed to determine the decay characteristics of argon in the ECR3 ion source. Results of this study as well as details of setup and operation of ECR3 for NOGAMS experiments are presented. [1] M. Paul et al., Nucl. Instr. and Methods in Phys. Res., Sect. B, vol. 456, p. 222, 2019. doi:10.1016/j.nimb.2019.04.003 |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-ECRIS2024-MOP15 | |
About • | Received ※ 13 September 2024 — Revised ※ 20 September 2024 — Accepted ※ 29 May 2025 — Issued ※ 07 June 2025 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUA2 | ECR2 performance upgrades at ATLAS | 72 |
|
||
Funding: This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract No. DE-AC02-06CH11357. The user requests for higher beam energies and intensities have driven the decision to upgrade the ECR2 ion source at the Argonne Tandem Linac Accelerator System. Multiple upgrades are in progress with the expected outcome of dramatically increased ECR2 beam intensities and charge state capabilities. The magnetic upgrades include integrating an improved hexapole permanent magnet array [1] that provides the ion source radial fields, reworking the magnetic materials surrounding the plasma chamber, and installing a new cooling system for the electromagnetic solenoids that govern the ion source axial fields. The new hexapole and higher solenoid magnet operating currents will increase the ion source magnetic fields and support the use of 18 GHz RF heating, further increasing the ECR2 beam capabilities. Following these improvements and subsequent source performance, simulations of beam transport devices on the ion source platform will need to be revisited for transmission of high intensity beams. Details of these upgrade projects and simulations of the ion optics are presented. [1] R. Vondrasek, J. McLain, and R. Scott, J. Phys.: Conf. Ser., vol. 2743, p. 012044. 2024. |
||
![]() |
Slides TUA2 [2.658 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-ECRIS2024-TUA2 | |
About • | Received ※ 13 September 2024 — Revised ※ 25 November 2024 — Accepted ※ 29 January 2025 — Issued ※ 05 June 2025 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |