Paper |
Title |
Page |
THYG01 |
The ILC Beam Delivery System Design and R&D Programme
|
2907 |
|
|
|
|
The presentation will describe recent developments for the ILC beam delivery system. Special emphasis will be given to the R&D programme at existing and planned test facilities.
|
|
|
Slides
|
|
THYG02 |
Results from the CLIC Test Facility CTF3 and Update on the CLIC Design
|
2912 |
|
- G. Geschonke
CERN, Geneva
|
|
|
The CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the next steps which should lead to feasibility demonstration of CLIC technology by the year 2010. The CLIC design has been reviewed in detail. The resulting changes in parameters will be presented.
|
|
|
Slides
|
|
THYG03 |
Ionization Cooling and Muon Colliders
|
2917 |
|
- R. P. Johnson
Muons, Inc, Batavia
|
|
|
Recent developments in the field of muon beam cooling are reviewed. A view of the impact of new cooling concepts on the overall design of muon colliders is included, as are the prospects for the experimental verification of the required muon beam cooling concepts and technology.
|
|
|
Slides
|
|