THYG  —  Linear Colliders, Lepton Accelerators and New Acceleration Techniques   (26-Jun-08   11:00—12:30)

Chair: J.-P. Delahaye, CERN, Geneva

Paper Title Page
THYG01 The ILC Beam Delivery System Design and R&D Programme 2907
 
  • T. Tauchi
    KEK, Ibaraki
 
  The presentation will describe recent developments for the ILC beam delivery system. Special emphasis will be given to the R&D programme at existing and planned test facilities.  
slides icon Slides  
THYG02 Results from the CLIC Test Facility CTF3 and Update on the CLIC Design 2912
 
  • G. Geschonke
    CERN, Geneva
 
  The CLIC Test Facility CTF3 is being built and commissioned in stages. Up to now the facility consists of an electron linac, a magnetic chicane for changing bunch length, the Delay Loop and the Combiner Ring. Recent experience and commissioning results will be presented together with plans for the next steps which should lead to feasibility demonstration of CLIC technology by the year 2010. The CLIC design has been reviewed in detail. The resulting changes in parameters will be presented.  
slides icon Slides  
THYG03 Ionization Cooling and Muon Colliders 2917
 
  • R. P. Johnson
    Muons, Inc, Batavia
 
  Recent developments in the field of muon beam cooling are reviewed. A view of the impact of new cooling concepts on the overall design of muon colliders is included, as are the prospects for the experimental verification of the required muon beam cooling concepts and technology.  
slides icon Slides