A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Zhao, M. H.

Paper Title Page
THPP124 Commissioning of the 150 MeV SSRF Linac 3649
 
  • M. H. Zhao, G. Q. Lin, W. H. Liu, B. L. Wang, J. Q. Zhang, S. P. Zhong, W. M. Zhou
    SINAP, Shanghai
 
  The 150 MeV SSRF linac has been integrated and commissioned from late 2006 to middle of 2007. This paper presents the design, installation, commissioning and status of this linac.