Paper |
Title |
Page |
TUPD016 |
Grounding and Induced Voltage Issues of the Injection Bump Magnet System of the 3-GeV RCS in J-PARC
|
1461 |
|
- T. Takayanagi, J. Kamiya, M. Kinsho, T. Ueno, M. Watanabe, M. Yoshimoto
JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
- Y. Irie
KEK, Ibaraki
|
|
|
The power supply of the injection shift bump magnets is required to rate a large current with high precision. The rating current is 20 kA and the pulse width is 1.3 ms. The power supply with the multiple connected two-quadrant IGBT choppers, which is controlled by the switching frequency over 48 kHz, realizes the tracking error less than 1.0 %. However, the switching noise due to the IGBT choppers caused damages to the control device and the measuring instrument. The ground cables were changed to copper sheets, so that the voltage due to the switching noise between the power supply board and the ground decreased from 800 V to 40 V. Furthermore, the output voltage of the RF shield was measured in connection with the several waveform patterns. These results showed the good agreement with the calculation and the experiment. The good performances of the shift bump magnet and power supply have been confirmed.
|
|
THPP097 |
Commissioning Results of the Kicker Magnet in J-PARC RCS
|
3590 |
|
- J. Kamiya, M. Kinsho, M. Kuramochi, T. Takayanagi, T. Togashi, T. Ueno, M. Watanabe, M. Yoshimoto
JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
|
|
|
Installation of the kickers in the extraction section of the RCS in J-PARC facility was completed. And they succeeded to extract the 3GeV proton beams in the first beam test. The operation parameters of the kickers agreed well with the parameters which were estimated from the magnetic field measurement and the current test of the power supplys. In this report, we summarized the results of the excitation test and the commissioning of the kicker magnet. The results of the magnetic field measurement showed the good uniformity in the wide range of the aperture. The characteristic feature of each kicker power supply was also measured precisely. Although the rise time and jitter of the output pulse have some minor variation due to the different characteristics of the thyratrons, the degree of variation was acceptably small. Combining the results of the magnetic field measurements, the relation between the charging voltage and the magnetic field was obtained for each kicker. The accelerated beam was successfully extracted at the operation parameters which were obtained from the relationship. The measurements result which was obtained by using the beam is also reported.
|
|
THPP112 |
Leakage Field of Septum Magnets of 3 GeV RCS at J-PARC
|
3626 |
|
- M. Yoshimoto, H. Hotchi, J. Kamiya, M. Kinsho, M. Kuramochi, P. K. Saha, T. Takayanagi, T. Togashi, T. Ueno, M. Watanabe
JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
- H. Harada
Hiroshima University, Graduate School of Science, Higashi-Hiroshima
|
|
|
Septum magnets are installed in RCS (Rapid cycling Synchrotron) at J-PARC for the beam injection and extraction. In order to realize MW beam in the RCS ring and reduce the beam loss during the beam injection and extraction, the septum magnets have large physical aperture and are operated in DC. Thus there are high magnetic fields in the gaps during the acceleration, but the leakage fields are nevertheless suppressed down to a few Gauss to suppress the closed orbit distortion. In order to reduce the magnetic leakage field from the septa at beam orbit in the RCS ring, the silicon steel sheets are set for magnetic shield. In addition a few ring vacuum chambers are made by the magnetic stainless steel. Up to now, the development and field measurement of the septum magnets has been finished, and the beam commissioning of the RCS are carried out. In this presentation, the field measurements of the septum magnets are summarized and the influences of the leakage field upon the beam orbit are reported.
|
|