WEPC090 Overview of the Status of the Elettra Booster Project 2201
 
  • M. Svandrlik
    ELETTRA, Basovizza, Trieste
 
  The Elettra Booster Project is in its final phase. The 100 MeV linac pre-injector and the 2.5 GeV booster were constructed and installed on schedule and within the foreseen budget. Elettra was shut down during the last autumn to switch from the old linac injector to the new booster. The new 2.5 GeV transfer line was successfully connected to the storage ring by December 2007. During the same period the booster commissioning was started. Operation for users of the light source, with the booster as injector, is scheduled in March 2008. An overview of the booster systems and of the current status of its commissioning and operation is presented and discussed here.  
THPP133 Magnet Power Converters for the New Elettra Full Energy Injector 3673
 
  • R. Visintini, G. Cautero, M. Cautero, D. M. Molaro, M. Svandrlik, M. Zaccaria
    ELETTRA, Basovizza, Trieste
 
  A large number of power converters has been required to supply the coils and the magnets of the four sub-structures of the new Elettra full energy injector. The Linac, and the two transfer lines require highly stabilized DC power converters while the Booster has to be operated at 3 Hz supplying the magnets with sinusoidal current waveforms. The extraction Bumpers require slow pulse supplies. In order to keep all output voltages below 1 kV, a special connection has been adopted for the Booster dipoles. A particular type of low power four-quadrant converters with embedded Ethernet connection has been designed at Elettra for this specific project. The article will present the relevant facts about the different power converters and their performances.