TUPP005 | Application Programs for the Elettra Booster Commissioning and Operation | 1535 |
|
||
The application programs developed for the commissioning and operation of the new Elettra injector* are all based on the TANGO control system, a new high level framework and a beam optics module named Vicky**. The present paper summarizes the main developed application programs and their successful use during commissioning and operation of the new injector.
*"Overview of the Status of the Elettra Booster Project," these proceedings. |
||
WEPC079 | Elettra Booster Commissioning and Operation | 2180 |
|
||
The new injector, consisting of a 100MeV linac and a 2.5GeV booster synchrotron, replaced the old limited energy 1.2GeV linac by the end of 2007*. The paper reports on its commissioning phases and results together with its present status of operation.
*"Overview of the Status of the Elettra Booster Project", WEPC090, these proceedings. |