A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Hotchi, H.

Paper Title Page
THPP105 Beam Commissioning Results of the RCS Injection and Extraction at J-PARC 3611
 
  • P. K. Saha, N. Hayashi, H. Hotchi, F. Noda, Y. Shobuda
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Harada
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • Y. Irie
    KEK, Ibaraki
 
  The beam commissioning of J-PARC (Japan Proton Accelerator Research Complex) 3 GeV RCS (Rapid Cycling Synchrotron) has been started from the end of year 2007. As injection is in the very first stage, an accurate and well controlled beam at the injection strongly related to the other part of the RCS commissioning, including extraction where, an well extracted beam directly reflects the overall commissioning result. In this paper, the beam commissioning results of the RCS injection and extraction will be reported.  
THPP112 Leakage Field of Septum Magnets of 3 GeV RCS at J-PARC 3626
 
  • M. Yoshimoto, H. Hotchi, J. Kamiya, M. Kinsho, M. Kuramochi, P. K. Saha, T. Takayanagi, T. Togashi, T. Ueno, M. Watanabe
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Harada
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
 
  Septum magnets are installed in RCS (Rapid cycling Synchrotron) at J-PARC for the beam injection and extraction. In order to realize MW beam in the RCS ring and reduce the beam loss during the beam injection and extraction, the septum magnets have large physical aperture and are operated in DC. Thus there are high magnetic fields in the gaps during the acceleration, but the leakage fields are nevertheless suppressed down to a few Gauss to suppress the closed orbit distortion. In order to reduce the magnetic leakage field from the septa at beam orbit in the RCS ring, the silicon steel sheets are set for magnetic shield. In addition a few ring vacuum chambers are made by the magnetic stainless steel. Up to now, the development and field measurement of the septum magnets has been finished, and the beam commissioning of the RCS are carried out. In this presentation, the field measurements of the septum magnets are summarized and the influences of the leakage field upon the beam orbit are reported.