A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Harada, H.

Paper Title Page
TUPC093 Beam Profile Monitor of the J-PARC 3GeV Rapid Cycling Synchrotron 1275
 
  • K. Satou, N. Hayashi, R. Saeki, A. Ueno, K. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Harada
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • S. Lee, T. Toyama
    J-PARC, KEK & JAEA, Ibaraki-ken
  • M. Tejima
    KEK, Ibaraki
 
  To obtain high intensity (1MW) and large emittance (214 π mm mrad) beam profiles of the 3GeV Rapid Cycling Synchrotron (RCS) of the J-PARC, we have developed the ionization profile monitors (IPMs) with wide active aperture and high dynamic range. It has three Microchannel Plates (MCPs) with active area of 81*41mm for signal multiplication and read out devices, and magnet system to generate guiding fields to collect electrons. The wide active aperture of ±116mm is obtained by arranging the three MCPs perpendicular to the beam axis. Furthermore, the dynamic range of 104 level can be obtained by adjusting each bias voltage of the MCPs. The IPMs are now collecting ions without the guiding fields. The beam commissioning of the RCS has been in progress since last year. The horizontal and vertical profiles are of great help, particularly to check injection errors. At the conference, the present status of the IPM system and the latest beam profiles will be reported.  
THPP105 Beam Commissioning Results of the RCS Injection and Extraction at J-PARC 3611
 
  • P. K. Saha, N. Hayashi, H. Hotchi, F. Noda, Y. Shobuda
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Harada
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • Y. Irie
    KEK, Ibaraki
 
  The beam commissioning of J-PARC (Japan Proton Accelerator Research Complex) 3 GeV RCS (Rapid Cycling Synchrotron) has been started from the end of year 2007. As injection is in the very first stage, an accurate and well controlled beam at the injection strongly related to the other part of the RCS commissioning, including extraction where, an well extracted beam directly reflects the overall commissioning result. In this paper, the beam commissioning results of the RCS injection and extraction will be reported.  
THPP112 Leakage Field of Septum Magnets of 3 GeV RCS at J-PARC 3626
 
  • M. Yoshimoto, H. Hotchi, J. Kamiya, M. Kinsho, M. Kuramochi, P. K. Saha, T. Takayanagi, T. Togashi, T. Ueno, M. Watanabe
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Harada
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
 
  Septum magnets are installed in RCS (Rapid cycling Synchrotron) at J-PARC for the beam injection and extraction. In order to realize MW beam in the RCS ring and reduce the beam loss during the beam injection and extraction, the septum magnets have large physical aperture and are operated in DC. Thus there are high magnetic fields in the gaps during the acceleration, but the leakage fields are nevertheless suppressed down to a few Gauss to suppress the closed orbit distortion. In order to reduce the magnetic leakage field from the septa at beam orbit in the RCS ring, the silicon steel sheets are set for magnetic shield. In addition a few ring vacuum chambers are made by the magnetic stainless steel. Up to now, the development and field measurement of the septum magnets has been finished, and the beam commissioning of the RCS are carried out. In this presentation, the field measurements of the septum magnets are summarized and the influences of the leakage field upon the beam orbit are reported.