A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Gu, Q.

Paper Title Page
MOPP087 RF System for the SSRF Booster Synchrotron 754
 
  • Q. Gu, L. X. Chen, M. Chen, L. Feng, Z. Q. Feng, H. T. Hou, J. F. Liu, C. Luo, D. Q. Mao, F. Wang, Zh. G. Zhang, S. J. Zhao, Y. B. Zhao, Z. S. Zhou
    SINAP, Shanghai
 
  The booster synchrotron of the Shanghai Synchrotron Radiation Facility (SSRF) ramps the energy of electron beam from 150 MeV to 3.5 GeV with a repetition rate of 2 Hz. The guidelines of the system design are simplicity and reliability, and the ability of top-up injection for the storage ring is also taking into account. The RF system consists of a 180kW CW plant with a WR1800 waveguide line, two PETRA type 5-cell cavities and an analog low level RF electronics with vector-sum scheme. An overview, installation and commissioning of the whole booster RF system are presented in this paper. The performance of the RF system with the beam is also given.  
WEPC040 Commissioning of the SSRF Booster 2073
 
  • H. H. Li, Q. Gu, D. M. Li, L. G. Liu, D. Wang, Z. T. Zhao
    SINAP, Shanghai
 
  The SSRF Booster, designed to accelerate the electrons from 150MeV to 3.5GeV, is a FODO structure synchrotron with 180m circumference and 2Hz repetition rate. The commissioning of the SSRF booster from the LTB transfer line started on Sept. 30th evening, 2007, the first turns of beam in the booster was obtained in 20 hours. With about 60 hours effective commissioning effort, the electrons were accelerated to 3.5GeV on October 5th morning, 2007. And then the first 3.5GeV beam was extracted to BTS transfer line on October 30th, 2007. In this paper, the SSRF booster is introduced and its commissioning results are presented.