A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Yamamoto, K.

Paper Title Page
WEPCH169 Alternating Phase Focused IH-DTL for Heavy-ion Medical Accelerators 2328
 
  • Y. Iwata, T. Fujisawa, T. Furukawa, S. H. Hojo, M. Kanazawa, N. M. Miyahara, T. Murakami, M. Muramatsu, K. Noda, H. Ogawa, Y. S. Sakamoto, S. Yamada, K. Yamamoto
    NIRS, Chiba-shi
  • T. Fujimoto, T. Takeuchi
    AEC, Chiba
  • T. Mitsumoto, H. Tsutsui, T. Ueda, T. Watanabe
    SHI, Tokyo
 
  Tumor therapy using HIMAC has been performed at NIRS since June 1994. With the successful clinical results over more than ten years, a number of projects to construct these complexes have been proposed over the world. Since existing heavy-ion linacs are large in size, the development of compact linacs would play a key role in designing compact and cost-effective complexes. Therefore, we developed an injector system consisting of RFQ and Interdigital H-mode (IH) DTL having the frequency of 200 MHz. The injector system can accelerate carbon ions up to 4.0 AMeV. For the beam focusing of IH-DTL, the method of Alternating Phase Focusing (APF) was employed. With the IH structure and rather high frequency, the cavity size is compact; the radius is 0.4 m, and lengths of RFQ and IH-DTL are 2.5m and 3.5m respectively. The fabrication of RFQ was completed, and we succeeded to accelerate carbon ions with satisfactory performances. For IH-DTL, the full-scale model was first fabricated. With the encouraging result* of its electric field measurement, we constructed IH-DTL and beam acceleration tests will be performed in March 2006. We will present the performances of the entire injector system.

*Y. Iwata et al., Nucl Instr. & Meth in Phys. Res. A (submitted).

 
THPCH172 Present Status of Beam Collimation System of J-PARC RCS 3200
 
  • K. Yamamoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • M. Abe, H. Hanaue, A. Nakamura, Y. Takeuchi
    VIC International Co., Ltd., Tokyo
  • Y. Hirooka, M. Okazaki
    Mitsui Engineering & Shipbuilding Co., Ltd., Tokyo
 
  The precedence manufacture of the two beam collimator was carried out. In these two sets, we tested the heat transfer capacity of cooling fins and remote clamp handling system. The vertical collimator was able to keep temperature under 120 degrees C by the design heat 400W, but in case of the horizontal collimator, it went over 200 degrees C by the design heat 700W. The design was changed towards adding an air duct. About remote clamp handling system, it checked that it could attach by the He leak below 5.*10-10Pa m3/sec as a result of the helium leak examination.