A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Tarawneh, H.

Paper Title Page
TUPCH079 Characterisation of the MAX-II Electron Beam: Beam Size Measurements 1193
 
  • M. Sjöström, H. Tarawneh, E.J. Wallén
    MAX-lab, Lund
 
  Over the last year investigations of the MAX-II electron beam characteristics have been made. Examples of investigated parameters include the beam size, bunch length, vacuum and Touschek lifetimes, and the machine functions. Several upgrades of the MAX II ring have been performed since the commissioning 1995 like a new 100 MHz RF system with a 500 MHz Landau cavity, exchanged injector, and a variety of insertion devices. There is hence a need to systematically characterize the present machine. This systematic characterisation is now underway and this article describes details of the beam size measurements.  
THPLS059 Status of the MAX IV Light Source Project 3418
 
  • M. Eriksson, M. Berglund, K.I. Blomqvist, M. Brandin, T. Hansen, D. Kumbaro, L.-J. Lindgren, L. Malmgren, M. Sjöström, H. Svensson, H. Tarawneh, S. Thorin, E.J. Wallén, S. Werin
    MAX-lab, Lund
  • B. Anderberg
    AMACC, Uppsala
 
  The present development of the accelerator part of the MAX IV synchrotron radiation project is presented. The main features of the 3 GeV injector linac and the two storage rings operated at different electron energies to cover a broad spectral range of high brilliance undulator radiation are described in some detail. A third ring, the existing MAX III ring, is planned to be transferred to the new facility. The preparation of the injector linac to serve as a free electron laser source and the major sub-systems of the facility are also presented.  
THPLS043 Status of SESAME 3383
 
  • G. Vignola, A. Amro, M. Attal, H. Azizi, A. Kaftoosian, F. Makahleh, M.M. Shehab, H. Tarawneh, S. Varnasseri
    SESAME, Amman
 
  An overview of the status of SESAME is presented. SESAME is a third generation light source facility, with an e-beam energy of 2.5 GeV, located in Allan, Jordan. The emittance is 26 nm.rad and 12 straights are available for insertion devices. The injector consists of a 22.5 MeV microtron and 800 MeV booster synchrotron, with a repetition rate of 1 Hz. The conceptual design of the accelerator complex has been frozen, and the engineering design is in progress. The phase I scientific program for SESAME has also been finalized, and it foresees 6 beam lines, including 2 IR ports. The construction of the SESAME building is in progress, and the beneficial occupancy is expected by the end of 2006. The completion of the accelerators complex construction is scheduled for the end of 2009.