Japan Proton Accelerator Research Complex (J-PARC) is under construction at the Tokai campus of Japan Atomic Energy Agency (JAEA) as a joint project between KEK and JAEA. The accelerator complex, which is constructed as a 200 MeV linac, a 3 GeV RCS synchrotron, and a main ring in phase I. The main ring magnet power supply is constructing as the energy of 40 GeV in phase I and will upgrade up to 50 GeV in phase II. A large amount of pulse electric power, which is + 115 MW and -55 MW peak-to-peak, is required for 50 GeV operation and this large pulse power will give unallowable disturbances to a power network. In order to compensate the disturbances to allowable level, we need some energy storage system. A SMES system will be one of the promising means for the purposes as well as the fly-wheel system. We will describe some energy storage system and also the increasing of repetition rate without energy storage system.
|
|