Noah, E.

Paper Title Page
TUPLS129 EURISOL 100 kW Target Stations Operation and Implications for its Proton Driver Beam 1807
 
  • E. Noah, F. Gerigk, J. Lettry, M. Lindroos, T. Stora
    CERN, Geneva
 
  Targets for the next generation radioactive ion beam (RIB) facilities (RIA, EURISOL) will be subjected to energy deposition levels that call for a specific design of the target and ion source assembly to dissipate the deposited heat and to extract and ionize isotopes of interest efficiently. EURISOL, the next generation European RIB facility, plans to operate four target stations in parallel, three 100 kW direct targets and one 5 MW spallation neutron source with a GeV proton linac driver. The nature of the beam sharing has yet to be defined because in practice it will have a direct impact on target design, operation and lifetime. Splitting the beam in time implies that each target would be subjected to a pulsed beam, whose pulse width and repetition cycle have to be optimized in view of the RIB production. The 100 kW targets are expected to have a goal lifetime of three weeks. Target operation from the moment it is installed on a target station until its exhaustion involves several phases during which the incident proton beam intensity will vary. This paper discusses challenges for high power targetry at EURISOL, with an emphasis on requirements for the proton linac parameters.