A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Muto, M.

Paper Title Page
MOPCH118 Wideband Low-output-impedance RF System for the Second Harmonic Cavity in the ISIS Synchrotron 321
 
  • Y. Irie
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • D. Bayley, G.M. Cross, I.S.K. Gardner, M.G. Glover, D. Jenkins, A. Morris, A. Seville, S.P. Stoneham, J.W.G. Thomason, T. Western
    CCLRC/RAL/ISIS, Chilton, Didcot, Oxon
  • J.C. Dooling, D. Horan, R. Kustom, M.E. Middendorf, G. Pile
    ANL, Argonne, Illinois
  • S. Fukumoto, M. Muto, T. Oki, A. Takagi, S. Takano
    KEK, Ibaraki
 
  Wideband low-output-impedance RF system for the second harmonic cavity in the ISIS synchrotron has been developed by the collaboration between Argonne National Laboratory, US, KEK, Japan and Rutherford Appleton Laboratory, UK. Low output impedance is realized by the feedback from plate output to grid input of the final triode amplifier, resulting in less than 30 ohms over the frequency range of 2.7 - 6.2 MHz which is required for the second harmonic cavity. The vacuum tubes in the driver and final stages are both operated in class A, and a grid bias switching system is used on each tube to avoid unnecessary plate dissipations during a non-acceleration cycle. High power test was performed with a ferrite-loaded second harmonic cavity, where the bias current was swept at 50 Hz repetition rate. The maximum voltage of 12kV peak per accelerating gap was obtained stably at earlier period of an acceleration cycle. A beam test with this system is planned at the ISIS synchrotron in order to investigate how the low impedance system works under heavy beam loading conditions, and is capable of mitigating the space charge detuning at the RF trapping stage.  
TUPLS077 Development of FFAG-ERIT Ring 1675
 
  • K. Okabe, M. Muto
    KEK, Ibaraki
  • Y. Mori
    KURRI, Osaka
 
  An intense neutron source with the emittance recovery internal target (ERIT) using the FFAG accelerator is under development. The design of the FFAG storage ring for this purpose will be presented.  
WEPLS072 Results of Field Measurements for J-PARC Main Ring Magnets 2547
 
  • K. Niki, K. Ishii, Y. Nemoto, E. Yanaoka
    KEK, Ibaraki
  • M. Muto
    New Affiliation Request Pending, -TBS-
 
  The mass production of J-PARC main ring magnets had been completed till the end of fiscal year 2004. Those magnets consists of 97 bending magnets with 6-m in length, 216 quadrupole magnets with 11 families and 72 sextupole magnets. We have been measured the magnetic field for all of these magnets and we will finish it in March, 2006. The obtained distributions for the BL products of bending magnets and the GL products of quadrupole magnets are within the required tolerance limits, values of which are estimated by the beam optics for COD correction, etc. The measured multi-pole components for these magnets, and so on, will be also reported.