WEPLS070 The Elettra Booster Magnets Construction Status 2541
 
  • D. Zangrando, D. Castronovo, F. Iazzourene, M. Svandrlik
    ELETTRA, Basovizza, Trieste
 
  The third generation light source ELETTRA has been in operation since 1993. A new 2.5 GeV full energy booster injector has been approved and founded last year. It will replace the existing linear injector limited to a maximum energy of 1.2 GeV. During last year, after having completed the specifications and the preliminary magnetic and mechanical design, the orders for all the magnets were assigned to two European firms. The paper reports on the magnets' construction status and the requested specifications.  
THPLS031 Elettra Top-up Requirements and Design Status 3350
 
  • F. Iazzourene, S. Bassanese, A. Carniel, K. Casarin, R. De Monte, M. Ferianis, F. Giacuzzo, M. Lonza, G. Tromba, A. Vascotto
    ELETTRA, Basovizza, Trieste
 
  Elettra is a 2.5 GeV third generation light source in operation since 1993. To provide more stable beams to the users, we plan to operate in the so-called top-up injection mode. The first step is the substitution of the present 1GeV linac by a 100 MeV pre-injector linac and a fast cycling 2.5 GeV synchrotron booster foreseen to be in operation in 2007*. The present paper will report on the requirements for the top-up operation in terms of radiation safety, diagnostics H/S, timing, modality, etc. and the design status. In particular, a new BPM system, based on the log-ratio detectors, has been successfully commissioned on the present transfer line and linac and is ready to be deployed on the new injector and to be used by the new foreseen shot to shot transfer line booster to storage trajectory feedback system. Furthermore, in order to flatten the storage ring filling, the top-up charge will be integrated where needed. Preliminary measurements on the bunch by bunch measurement methods of the storage ring bunch charge are reported.

*“Elettra New Full Energy Injector Status Report”, these proceedings.

 
THPLS032 ELETTRA New Full Energy Injector High Level Software 3353
 
  • C. Scafuri, F. Iazzourene
    ELETTRA, Basovizza, Trieste
 
  The control system for the new full energy injector* will be entirely based on Tango with an object oriented distributed architecture. The availability of the new and modern software platform led us to design and develop a new high level software framework which allows a model-based accelerator control. The new design is fully object oriented and follows a layered approach. The main layers provide a set of different views or abstractions of the underlying accelerator: field layer, machine layer, and optics layer. The field layer handles all the access and communications with the actual devices of the accelerator, e.g., power supplies, instrumentation, etc. The machine layer handles the machine layout description, functional constraints like the association of a string of magnets with one power supply, and the conversion from actual values acquired from the field into values meaningful to beam dynamics problems. The optics layer performs all the actual calculations concerning the beam like beta functions, damping times, etc. An important characteristic of the new library is the unified management of all the needed calibrations and configurations by means of a relational database.

*“Elettra New Full Energy Injector Status Report”, these proceedings.

 
THPLS033 Elettra New Full Energy Injector Status Report 3356
 
  • M. Svandrlik, S. Bassanese, F.C. Cargnello, A. Carniel, K. Casarin, D. Castronovo, P. Craievich, G. D'Auria, R. De Monte, S. Di Mitri, A. Fabris, R. Fabris, M. Ferianis, A. Gambitta, F. Giacuzzo, M. Giannini, F. Iazzourene, G.L. Loda, M. Lonza, F.M. Mazzolini, D.M. Morelli, G. Pangon, C. Pasotti, G. Penco, L.P. Pivetta, L. Rumiz, C. Scafuri, G. Tromba, A. Vascotto, R. Visintini, D. Zangrando
    ELETTRA, Basovizza, Trieste
 
  The Elettra new full energy injector will be based on a 100 MeV linac pre-injector, a 2.5 GeV booster synchrotron and two new beam transfer lines. It will replace the existing 1.2 GeV linac injector and transfer line. Full funding was finally available in 2005, which allowed to start, or in some cases to re-start, the construction activities. The status of the project will be presented in this paper, in particular the progress of the fabrication of various components, like magnets, power supplies, vacuum chambers; also the status of the construction of the building and technical plants will be given. Results of recent optimization studies will also be outlined. The commissioning of the new injector is scheduled to start in Spring 2007, while the first ELETTRA operation for user's with the new full energy injector is expected for the last quarter of 2007.