A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Dressler, O.

 
Paper Title Page
TUOBFI01 A Diagnostic Kicker System as a Versatile Tool for Storage Ring Characterisations 974
 
  • O. Dressler, J. Feikes, J. Kolbe
    BESSY GmbH, Berlin
 
  For the BESSY II Synchrotron Light Source two diagnostic kicker systems including current pulsers were developed, allowing vertical and horizontal deflection of the stored beam. Synchronised with the revolution trigger, simultaneous pulsing of the systems kicks the stored beam in any transverse direction with a repetition rate of up to 10 Hz allowing a wide range of storage ring investigations. Examples are dynamic aperture measurements and frequency map measurements. Special efforts were made to assure the demands of high amplitude and time stability for this kind of experiments. The technical concept of the systems and the controlling of the measurements are described.  
slides icon Transparencies
WEPLS115 Impedances in Slotted-Pipe Kicker Magnets 2649
 
  • F. Marhauser, O. Dressler, V. Duerr, J. Feikes
    BESSY GmbH, Berlin
 
  Storage ring slotted-pipe kicker magnets based on the DELTA design are foreseen for the Metrology Light Source (MLS) of the Physikalisch-Technische Bundesanstalt currently under construction near the BESSY site. Although the slotted pipe maintains the cross-section of the storage ring vacuum chamber, image currents have to bypass the slots generating wakefields. Actually modes with substantial impedances have been revealed by simulations and verified by measurements of a kicker model for the MLS.  
THPLS014 Status of the Metrology Light Source 3299
 
  • K. Buerkmann-Gehrlein, M. Abo-Bakr, W. Anders, P. Budz, O. Dressler, V. Duerr, J. Feikes, H.G. Hoberg, D. Krämer, P. Kuske, R. Lange, J. Rahn, T. Schneegans, D. Schueler, E. Weihreter, G. Wuestefeld
    BESSY GmbH, Berlin
  • R. Klein, G. Ulm
    PTB, Berlin
 
  For more than 25 years, the Physikalisch-Technische-Bundesanstalt (PTB) uses synchrotron radiation at the storage rings BESSY I and II for photon metrology in the spectral range of UV to x-rays. Since decommissioning of BESSY I (1999), there is a gap in the spectral range of UV and EUV wavelength due to the higher electron energy of BESSY II. Thus, in 2003, the Metrology Light Source (MLS), a low energy electron storage ring, was approved, as central instrument in the future Willy Wien Laboratory (WWL). Design, construction and operation of the MLS are realized by BESSY, based on the PTB requirements for a permanent accessible radiometry source, optimized for the spectral range between UV up to VUV. The MLS is tuneable in energy between 200 MeV and 600 MeV, designed for currents between 1pA up to 200mA. Civil construction of WWL in the close vicinity to BESSY is nearing completion. The first MLS components will be installed in spring 2006, commissioning of the 100MeV Microtron is scheduled for summer 2006, while commissioning of the storage ring will start in spring 2007. Regular user operation will begin in January 2008. A status and an overview on the construction of the MLS are