WEPLS070 The Elettra Booster Magnets Construction Status 2541
 
  • D. Zangrando, D. Castronovo, F. Iazzourene, M. Svandrlik
    ELETTRA, Basovizza, Trieste
 
  The third generation light source ELETTRA has been in operation since 1993. A new 2.5 GeV full energy booster injector has been approved and founded last year. It will replace the existing linear injector limited to a maximum energy of 1.2 GeV. During last year, after having completed the specifications and the preliminary magnetic and mechanical design, the orders for all the magnets were assigned to two European firms. The paper reports on the magnets' construction status and the requested specifications.  
THPLS033 Elettra New Full Energy Injector Status Report 3356
 
  • M. Svandrlik, S. Bassanese, F.C. Cargnello, A. Carniel, K. Casarin, D. Castronovo, P. Craievich, G. D'Auria, R. De Monte, S. Di Mitri, A. Fabris, R. Fabris, M. Ferianis, A. Gambitta, F. Giacuzzo, M. Giannini, F. Iazzourene, G.L. Loda, M. Lonza, F.M. Mazzolini, D.M. Morelli, G. Pangon, C. Pasotti, G. Penco, L.P. Pivetta, L. Rumiz, C. Scafuri, G. Tromba, A. Vascotto, R. Visintini, D. Zangrando
    ELETTRA, Basovizza, Trieste
 
  The Elettra new full energy injector will be based on a 100 MeV linac pre-injector, a 2.5 GeV booster synchrotron and two new beam transfer lines. It will replace the existing 1.2 GeV linac injector and transfer line. Full funding was finally available in 2005, which allowed to start, or in some cases to re-start, the construction activities. The status of the project will be presented in this paper, in particular the progress of the fabrication of various components, like magnets, power supplies, vacuum chambers; also the status of the construction of the building and technical plants will be given. Results of recent optimization studies will also be outlined. The commissioning of the new injector is scheduled to start in Spring 2007, while the first ELETTRA operation for user's with the new full energy injector is expected for the last quarter of 2007.